Laserfiche WebLink
0 °: NOTES PARTS <br /> zID <br /> 1. AIR-VAC UNIT AND BOX TO BE A. CL 52 DUCTILE IRON PIPE WITH ROMAC,FORD OR <br /> c INSTALLED IN NON-TRAFFIC AREA. MUELLER SERVICE SADDLE. <br /> w5. <br /> 2. USE MUELLER DOUBLE STRAP SERVICE B. 1"FORD F600 SERIES CORPORATION STOP. <br /> m al' CLAMP OR APPROVED EQUAL ON ALL <br /> CCOO'O MAINS LESS THAN 8" IN DIAMETER. C. 1"TYPE"K"COPPER TUBING. <br /> (7). <br /> nCD 0 3. ALL PIPE FITTINGS BETWEEN MAIN AND D. 1"FORD 602-44 ANGLE COUPLING. <br /> 3 UNION,AFTER AIR/VACUUM RELIEF <br /> (1) O VALVE,SHALL BE BRASS. E. 1"FORD B21-444 CURB STOP. <br /> 3 <br /> " 4. INSTALLATIONS FOR OTHER SIZE F. 1"BRASS NIPPLE. <br /> C O AIR/VACUUM RELIEF VALVES SHALL BE <br /> INDIVIDUALLY DESIGNED AND WILL G. 6"PVC PIPE. <br /> 4REQUIRE APPROVAL BY THE CITY <br /> kg 0 <br /> UTILITIES DEPARTMENT. H. 1"BRASS UNION. <br /> ? 5. PAINT METER BOX LID AND RISER I. 1"BRASS 90°ELL. <br /> ASSEMBLY(2)COATS SAFETY YELLOW, <br /> OIL BASE ENAMEL-HAND BRUSH <br /> N F 0 J. 1"COMBINATION AIR AND VACUUM RELIEF VALVE <br /> APPLIED.STENCIL RISER ASSEMBLY APCO 143-C,VALMATIC 201C OR EQUAL. <br /> D <br /> 0 0 WITH"AV"AND SIZE OF AIR/VAC K. 2"X l"GALV REDUCER. <br /> ASSEMBLY ON SIDE FACING ROADWAY <br /> IN 2"BLACK LETTERS. <br /> m , _...-...-.._.....---_.- L. 2"GALV PIPE. <br /> Z 6. AIR/VAC RELEASE VALVE ASSEMBLY <br /> z O SHALL BE INSTALLED AT HIGH POINT ON M. 2"STREET ELL(HORIZ). <br /> X LINE.IF HIGH POINT FALLS IN LOCATION N. 2"GALV 90°ELL(VERT). <br /> V) CO 1 v WHERE ASSEMBLY CANNOT BE <br /> E E '-' INSTALLED,PROVIDE ADDITIONAL <br /> L n Wjf a IMP•! U 1 DEPTH TO CREATE NEW HIGH POINT. 0. 2"GALV RETURN BEND. <br /> N) p <br /> N 171 (- 7. CONCRETE VAULT PENETRATIONS SHALL P. GALV BEEHIVE STRAINER GREENBURG P-24-08,FOR <br /> C/) © BE CORE DRILLED AND GROUTED. 2"PIPE. <br /> --I <br /> p D. PROVIDE METER BOX BODY MANUFACTURED BY <br /> 0 <br /> © O <br /> O "RAVEN PRODUCTS,MODEL RMD-15-27-12", FLUSH <br /> _ 3"MIN CLR <br /> N SOLID COVER LID. <br /> 0 <br /> E. BACKFILL WITH SAWDUST TO BONNET. <br /> I,i I, <br /> — <br /> 0 0 ii <br /> 0, <br /> 0 0 <br /> jam' <br /> on <br /> o 2 CITY OF EVERETT <br /> am'PUBLIC WORKS DEPARTMENT <br /> " 0 <br /> 8 . '� ugYANSASS IR.IIEFTI I�PAULWILHEIM itrMIRA 1230%2016 <br /> 1" AIR-VACUUM VALVE ----- <br /> _;s? ASSEMBLY 512 <br /> CD! m I <br /> M Mill MI M all 11111111 M M E ME IIIII N = N MIIII NM - <br />