My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The unit price per linear foot for restoration of concrete curbs or curb and gutter and shall be <br /> full compensation for all materials, tools, labor and equipment necessary to complete the <br /> Work in accordance with the Plans, COE Standard Drawings, Standard Specifications and <br /> these Special Provisions, including sawcutting, removal, loading, hauling and disposal. <br /> Bid Item 51 - Cement Concrete Curb Ramp, Type B <br /> Bid Item 52 - Cement Concrete Curb Ramp, Type D <br /> Measurement and Payment: Unit Price per Each <br /> Measurement shall be by each Cement Concrete Curb Ramp Type unit completed as <br /> specified. <br /> The unit price per each Cement Concrete Curb Ramp Type shall be full compensation <br /> for all materials, tools, labor and equipment necessary to complete the Work in accordance <br /> with the Plans, COE Standard Drawings, Standard Specifications and these Special <br /> Provisions, including sawcutting, removal, loading, hauling and disposal <br /> Bid Item 53 - Permanent Pavement Marking <br /> Measurement and Payment: Lump Sum (LS) <br /> This lump sum bid item includes all costs associated with furnishing all labor, materials, and <br /> other equipment necessary for restoring and replacing permanent traffic marking, including <br /> and not limited to, stop bars, turn arrows, lettering, crosswalks, reflectors, delineators, and <br /> lane or fog-line striping removed or damaged by the Contractor's work in accordance with <br /> the COE Standard Drawing No. 720, Special Provisions and Plans. <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> i <br /> Watermain Replacement"U" Division B—BID DESCRIPTIONS October 1, 2019 <br /> WO No.—UP3698 SP-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.