My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> As allowed by the contract,the City directs the Contractor as follows: <br /> 1. The Scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The contract price shall be adjusted as described in this Change Order. <br /> i3. The duration of the Contract, and contractually scheduled completion date, shall be <br /> adjusted to the extent described in this Change Order. <br /> 4. Unless the Contractor timely and properly follows the procedures in the contract for <br /> seeking further equitable adjustment of time and compensation, including, but not <br /> limited to, delays,impacts, inefficiencies, overhead, and direct and indirect costs, and <br /> except as otherwise expressly provided herein, the Contractor will be barred from (a) <br /> asserting any claim for further adjustment of time and compensation arising out of, or <br /> relating to, the charges described in this Change Order or work described in Exhibit A <br /> and (b) asserting an equitable adjustment of time or price arising earlier than the date <br /> of this Change Order. This provision does not apply to requests for equitable <br /> 1 adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice. <br /> 5. This Change Order only changes the contract between Contractor and City to the <br /> ' extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> 1 <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Manager Department Director <br /> Manager(if applicable) (if applicable) <br /> applicable) <br /> Date: <br /> Date: Date: Date: <br /> I <br /> Watermain Replacement"U" Appendix C -Change Order Forms October 1, 2019 <br /> WO No UP3698 SP-267 <br />
The URL can be used to link to this page
Your browser does not support the video tag.