My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION P - PROPOSAL <br /> CITY OF EVERETT, WASHINGTON <br /> WATERMAIN REPLACEMENT "U" <br /> WORK ORDER#UP3698 <br /> To the City Council <br /> Everett, Washington <br /> The undersigned Bidder declares that he has carefully examined the Plans and Specifications,Notice to <br /> Contractors, Standard Specifications, Special Provisions, Appendix, Proposal, and Contract for the <br /> construction of approximately 2,630 linear feet of 12-inch and 3,020 linear feet of 8-inch ductile iron <br /> watermain and other such Work as may be necessary, in accordance with the Specifications, as shown <br /> on the Plans. The undersigned declares that he has made such investigations as are necessary to <br /> determine the conditions to be encountered, and that, if this Proposal is accepted, he will enter into a <br /> contract with the City of Everett, Washington, in the form of Contract hereto annexed, he will, to the <br /> ' extent required,provide the necessary equipment,tools, apparatus, and other means of construction,and <br /> he will furnish all labor and materials necessary to complete the Work in the manner herein specified <br /> and according to the requirements of the Engineer. <br /> The undersigned Bidder certifies that this Proposal is in all respects fair and is made without collusion <br /> on the part of any person, firm or corporation mentioned below, and no officer or employee of the City <br /> of Everett is personally or financially interested, directly or indirectly,in the Proposal or in any purchase <br /> of or sale of any materials or supplies for the Work to which it relates, or any portion of the profits <br /> thereof. <br /> The undersigned Bidder agrees that he will complete the Work in all respects as required by Division C, <br /> Article 2. Time for Completion and that he will pay liquidated damages to the City in the amount <br /> specified in the Contract. <br /> Accompanying this Proposal is a bid bond or certified check in the amount of five percent (5%) of the <br /> Proposal according to the conditions of the "Notice to Contractors" and "Division 1 - General <br /> Requirements" hereby attached. If this Proposal shall be accepted by the City of Everett, Washington, <br /> and the undersigned shall fail to execute a satisfactory contract and bond, as stated in the Division 1 — <br /> General Requirements hereto attached,within 14 calendar days after the Award Date,then the City may, <br /> at its option, determine that the undersigned has abandoned the Contract and thereupon this Contract <br /> shall be null and void and the amount of the bid bond or certified check accompanying this Proposal <br /> shall be forfeited and become the property of the City of Everett, Washington. <br /> I <br /> I <br /> i <br /> Watermain Replacement "U" Division P—PROPOSAL October 1, 2019 <br /> WO No.—UP3698 SP—17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.