My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and <br /> Ithe total amount named for any item, the unit price shall prevail,and totals shall be corrected to conform thereto. All entries must be <br /> typed or entered in ink. <br /> BID SCHEDULE <br /> IBIDDER: Road Construction <br /> Northwest, Inc . <br /> 1 =Nom id <br /> ITEM DESCRIPTION Unit Q UNIT PRICE TOTAL AMOUNT <br /> I1 Mobilization LS 1 $`al m•20 $ 1 )-�,(0C1 CO <br /> I2 Surveying LS 1 $ -2)0()0 . cC $ \3, 000 . 0)0 <br /> 3 SPCC Plan LS 1 $ I -(CSU,CC $_ ( ,610 0 CC <br /> 4 Force Account FA 1 $ 60,000.00 , $ 60,000.00 <br /> I <br /> 5 Traffic Control Labor HR 1000 $ 5S 5$_ 5 000 cc) <br /> I6 Maintenance and Protection of Traffic Control LS 1 $ CD,SOC'. 00 $ `a, 5'co, 00 <br /> 7 Trench Excavation Safety Systems LS 1 $ S. SCK}.c'0 $ 5,50o .00 <br /> 1 8 Street Cleaning &Sweeping HR 100 $ I(DU .O0 $ i (P,OC ; 00 <br /> 9 Erosion/Water Pollution Control FA 1 $ 3,000.00 $ 3,000.00 <br /> I <br /> 270 <br /> 10 Foundation Material, Class A or B TON $ a7 .CSC $ -VAC 00 <br /> I11 Gravel Borrow TON 2730 $ 11--I .C�-' $ 3 ,Sao G`) <br /> I12 Ductile Iron Pipe for Water Main, 4-Inch LF 60 $ -1 l ,c>0 $ H ,aGU _0 <br /> I13 Ductile Iron Pipe for Water Main, 6-Inch LF 160 $ 13- .00 $ 1 (/ 5X) cc <br /> 14 Ductile Iron Pipe for Hydrant Lead, 6-Inch LF 250 $. 1 .CDC) $ I . WC-) CC <br /> I _ . c `--t. l4' <br /> 15 Ductile Iron Pipe for Water Main, 8-Inch LF 3180 $_ 7�• _ $ <br /> I16 Ductile Iron Pipe for Water Main, 12-Inch LF 2620 $ C1CA .W $ -.)`- !3(6O a' <br /> IWatermain Replacement"U" Division P—PROPOSAL October 1, 2019 <br /> WO No.—UP3698 SP—19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.