My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> IItemITEM DESCRIPTION Unit Bid UNIT PRICE TOTAL AMOUNT <br /> No. Qty <br /> 1 36 Monument Cases EA 2 $ D:300 .0U $ lel L20r3 (,)v <br /> Sawcutting Asphalt Concrete Pavement, <br /> 1 37 Final Joint Cut up to 6-in LF 1100 $ ..00 $ D, 0-00 . 0 0 <br /> Sawcutting Asphalt Concrete Pavement, <br /> 38 Final Joint Cut additional 1-in thickness LF 400 $ U.2 $ l ' <br /> I <br /> Sawcutting Concrete Pavement, Final Joint <br /> 39 Cut up to 6-in LF 2200 $ H . L? $_ / SC3C) .(O <br /> ISawcutting Concrete Pavement at <br /> 40 Construction Joint, Final Joint Cut up to 6-in LF 1680 $ 0.L 5 $ t r 0C{ Co <br /> I Sawcutting Concrete Curb &Gutter & Si <br /> 41 Sidewalk LF 760 $ 5 •C' $ 3, <br /> I42 Temporary Pavement Patch SY 3720 $ i 0 .00 $ 7, `O .OD <br /> I43 Crushed Surfacing Top Course TON 890 $ 3L .1S $ 3 7o7 •Q <br /> 44 Cement Concrete Pavement SY 2550 $ 51 •OO $ I 5:, 3_) Co <br /> 45 Cement Concrete Pavement Base SY 200 $ ti 0 00 $ (COO <br /> I46 HMAPatch, CL 1/2" PG 64-22 Permanent Trench TON 210 $ U � <br /> $ 7,300 <br /> I47 HMA, CL 1/2" PG 64-22 Overlay TON 290 $ 1 3 $ �1 90 <br /> 48 Cement Concrete Sidewalk Restoration SY 370 $ 55 . 00 $a\,H(U .co <br /> 49 Monolithic Curb Cement Concrete Sidewalk SY 40 $ Ct 1 .00 $ 1 SRO .co <br /> 50 Cement Concrete Curb and Gutter, Type 1 LF 150 _$ .00 $ U <br /> I51 Cement Concrete Curb Ramp,Type B EA 1 $ 1 -1/.; .D0 $ - -3-15 op <br /> I52 Cement Concrete Curb Ramp,Type D EA 2 $ 1400 •GO $ 7,` . 03 <br /> I53 Permanent Pavement Marking LS 1 $ O. ) . 00 $_ 5,a.0 0S <br /> I Watermain Replacement"U" Division P—PROPOSAL October 1, 2019 <br /> WO No.—UP3698 SP—21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.