My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> SUBCONTRACTORS FORM <br /> 1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and electrical <br /> work (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or Subcontractors in the I <br /> chart below. If Bidder believes such work is not part of the scope of Work, Bidder shall write "NO <br /> WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of work identified, unless I <br /> Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor <br /> will be used for which alternate. <br /> 3. Bidder's bid shall be deemed nonresponsive and void if: I A. For heating, ventilation, air conditioning, plumbing and electrical work, Bidder fails (1) to <br /> submit as part of the Bid the names of such Subcontractors, (2) to name itself to perform such <br /> Work, or (3) to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, <br /> and electrical subcontractors applies only to proposed heating, ventilation and air conditioning, <br /> plumbing, and electrical subcontractors who will contract directly with the general contractor <br /> submitting the Bid to the City. <br /> Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br /> HEATING Subcontractor, bidder or"no work" 2C IU�,\/ , �, � aaa <br /> MUST be stated w 4 G <br /> VENTILATION AND AIR CONDITIONING (Z c A/w <br /> Subcontractor, bidder or"no work" MUST be <br /> stated 2e,,,,t-e.V, W CA SC'36, <br /> PLUMBING (as described in RCW Chap. 18.106) QC;ti 1v' <br /> Subcontractor, bidder or"no work" MUST be R �� ice, a aas ' <br /> stated Z-cf\+eye\ bCY:. <br /> ELECTRICAL (as described in RCW Chap. W s j- Ccc r S;Jeti,c Tv,c. <br /> 19.28) , <br /> Subcontractor, bidder or "no work" MUST be C' �' }`` �l�2 SE <br /> stated 7e,v,(3 Ct$cis S <br /> 1 <br /> Watermain Replacement"U" Division P-PROPOSAL October 1, 2019 I <br /> WO No.-UP3698 SP-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.