Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' DIVISION 1 — GENERAL REQUIREMENTS <br /> 1 Supplement Division 1 by adding the following: <br /> General Description and Location of Project <br /> ' Work being performed includes furnishing all labor, materials and equipment necessary to <br /> furnish approximately 2,630 feet new 12-inch diameter and approximately 3,020 feet of 8- <br /> inch diameter new ductile iron pipe and appurtenances, miscellaneous shoulder stabilization <br /> and grading work, and other such appurtenances and performing all Work as required by the <br /> Contract, in accordance with the Contract Plans and Contract Provisions. <br /> The Project is in Everett, Washington, and is generally located along 5th Street between <br /> Legion Golf Course and Legion Drive, Waverly Avenue between 8th Street and 5th Street, and <br /> Baker Avenue between 15th Street and 21St Street. <br /> Design Engineer <br /> (******) <br /> Questions and inquiries about these Contract Documents should be directed in writing to the <br /> ' attention of Richard Hefti, PE, City Project Manager, rhefti@everettwa.gov. <br /> Standard Specifications <br /> (******) <br /> All Work under this Contract shall be performed in accordance with the following <br /> Specifications except as may be exempted or modified by other sections of these Contract <br /> Documents. These Specifications are incorporated by reference, made a part of this Contract <br /> and shall control and guide all activities within this Project whether referred to directly, <br /> paragraph by paragraph. <br /> WSDOT/APWA "2018 Standard Specifications for Road, Bridge and Municipal <br /> Construction", as amended by the APWA Supplements, hereinafter referred to as the <br /> "Standard Specifications." <br /> 1 The Standard Specifications, as modified or supplemented by the Amendments to the <br /> Standard Specifications and these Special Provisions, all of which are made a part of the <br /> Contract Documents, shall govern all of the Work. The following latest edition of other <br /> specifications and standard plans shall apply to the extent to which they are called out in <br /> these Plans and Special Provisions. <br /> 1. City of Everett "Design and Construction Standards and Specifications", latest <br /> edition as found on the Web at "http://everettwa.gov/DocumentCenter/View/243." <br /> ' 2. "Standard Plans for Road and Bridge Construction", as prepared by WSDOT. <br /> 3. "Manual on Uniform Traffic Control Devices (MUTCD)." <br /> ' 4. APWA Standards. <br /> 5. AWWA Standards. <br /> Each Provision of these Special Provisions either supplements, modifies, or replaces the <br /> comparable Standard Specification, or is a new Provision. The deletion, amendment, <br /> alteration, or addition to any subsection or portion of the Standard Specifications is meant to <br /> pertain only to that particular portion of the section, and in no way should it be interpreted <br /> ' that the balance of the section does not apply. <br /> Sections and subsections in the Special Provisions labeled under the headers with (******) <br /> indicate City of Everett Provisions. <br /> I <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—39 <br />