My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Examples of costs that are not included in Overhead include: travel and business <br /> meetings, telephones, professional fees expended for the benefit of a specific project, <br /> union welfare benefits, payroll taxes and equipment rental. <br /> If related party transactions are included in a Contractor's Overhead, they must be <br /> explicitly identified as related party transactions and must not exceed amounts that <br /> ' would be incurred in an arms-length transaction for the provision of the same or similar <br /> goods and services. If such transactions exist and the amounts paid by the Contractor <br /> and included in Overhead are in excess of that which would normally be expended in an <br /> arms-length transaction, an adjustment, in the form of a reduction in the amount for <br /> calculation purposes, must be included in any calculation in determining the amount of <br /> Allocable Overhead. <br /> Overhead shall not include any cost directly attributable to a particular project. If a cost <br /> can be traced to a particular contract, the Contractor may not classify the cost as <br /> Overhead. <br /> Indirect or home office costs that vary substantially with the amount of Work performed <br /> shall not be included in the group of costs comprising Overhead. <br /> Overhead shall not include any costs specifically disallowed by Federal Acquisition <br /> Regulations, Subpart 31.2—Contracts with Commercial Organizations, or its successor. <br /> Further, "Overhead" shall not include the costs of any "field support services" that are <br /> more closely direct costs in nature, regardless of the manner in which the Contractor <br /> normally accounts for such costs. An example of such disallowed cost would be for <br /> material handling and expediting, which are costs incurred for the direct support and <br /> benefit of any specific project(s). <br /> In addition to compliance with Federal Acquisition Regulations, Subpart 31.2 examples <br /> of specific costs not allowed in a calculation under this Section of the Contract are <br /> Incentive Compensation paid to personnel classified as Overhead and otherwise <br /> includable under this Section of the Contract, travel and business meetings, employer <br /> paid benefits and taxes on direct payroll costs of any project, insurance costs directly <br /> identifiable to any specific project, penalties, and any costs incurred regarding company <br /> owned equipment normally classified as a direct project costs,. <br /> Owner: The City of Everett, Washington. "Owner" the "City" and "Contracting Agency" <br /> mean the same. <br /> Owners Representative : The person designated in writing by the City to act as its <br /> representative at the construction site and to perform construction inspection service <br /> and administrative functions relating to this Contract. The terms "Engineer", "Architect", <br /> or "City's Representative" shall be interchangeable with Owners Representative. <br /> Person: Includes individuals, associations, firms, companies, corporations, <br /> partnerships, and joint ventures. <br /> Project: The undertaking to be performed under the provisions of the Contract. <br /> Provide: Furnish and Install, complete in place. <br /> Punch List: List of incomplete items of Work and of items of Work that do not conform <br /> to the requirements of the Contract Documents. The Punch List is prepared after <br /> Substantial Completion. <br /> RCW: Means the Revised Code of Washington <br /> Schedule of Values: Allocation of Contract Sum to items of Work as described in 1- <br /> 09.9 PAYMENTS of these Special Provisions. <br /> Shall: Required conduct. <br /> I <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.