My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The City will not open or consider any Proposal or any supplement to a Proposal that is <br /> received after the time specified for receipt of Proposals, or received in a location other <br /> than that specified for receipt of Proposals. <br /> 1-02.10 Withdrawing, Revising, or Supplementing Proposal <br /> Delete 1-02.10 and substitute with the following: <br /> After submitting a physical Bid Proposal to the City, the Bidder may withdraw, revise, or <br /> supplement it if: <br /> 1. The Bidder submits a written request signed by an authorized person and <br /> physically delivers it to the place designated for receipt of Bid Proposals, and <br /> 2. The City receives the request before the time set for receipt of Bid Proposals, <br /> I and <br /> 3. The revised or supplemented Bid Proposal (if any) is received by the City <br /> before the time set for receipt of Bid Proposals. <br /> The original physical Bid Proposal may be supplemented, or revised and resubmitted as <br /> the official Bid Proposal if the City receives it before the time set for receipt of Proposals. <br /> If the Bidder does not submit a revised or supplemented package in time, then its bid <br /> shall be considered withdrawn. <br /> Email, fax or telephone requests to withdraw, revise, or supplement a Proposal are not <br /> acceptable. <br /> Resubmitted Proposals shall be in full compliance with the bidding requirements. Bid <br /> deposit shall be in an amount sufficient for the Proposal as resubmitted. <br /> After the scheduled time for opening Proposals, no Bidder will be permitted to withdraw <br /> his Proposal unless the award of contract is delayed for a period exceeding 45 calendar <br /> days. Proposals received after the scheduled closing for opening Proposals will be <br /> returned unopened to the Bidder. <br /> 1 1-02.12 Public Opening of Proposals <br /> Supplement 1-02.12 by adding the following: <br /> 1-02.12(1) Postponement of Opening <br /> The City reserves the right to postpone the date and time for receiving or opening of <br /> Bids, or both, at any time prior to the date and time established in the Notice to Bidders. <br /> 1 Postponement notices shall be provided to Bidders in the form of addenda. <br /> 1-02.13 Irregular Proposals <br /> Revise item 1 and 2 of 1-02.13 to read as follows: <br /> 1. A Proposal will be considered irregular and will be rejected if: <br /> a. The Bidder is not prequalified when so required; <br /> b. The authorized proposal form furnished by the City is not used or is altered; <br /> c. The completed proposal form contains any unauthorized additions, deletions, <br /> alternate Bids, or conditions; <br /> d. The Bidder adds provisions reserving the right to reject or accept the Award, <br /> or enter into the Contract; <br /> e. A price per unit cannot be determined from the Bid Proposal; <br /> f. The Proposal form is not properly executed; <br /> g. The Bidder fails to submit or properly complete a Subcontractor list, if <br /> applicable, as required in 1-02.6; <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.