My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 4. The Contractor believes, or with the reasonable exercise of ordinary care <br /> should believe, it is entitled to an adjustment of Contract Sum or Time, even if <br /> the total or exact amount or impact cannot yet be determined; <br /> 5. The Contractor believes it is required or directed to perform work that is <br /> outside the scope of the Contract Documents; or <br /> 6. An event occurs, or fails to occur, that the Contractor believes, or should <br /> reasonably foresee, may result in a Contract Claim; or <br /> 7. The actual quantities of Unit Price Work vary sufficiently from the original <br /> estimate that Contractor may be entitled to an equitable adjustment of <br /> Contract Sum as provided in 1-04.6 VARIATION IN INCREASED OR <br /> DECREASED QUANTIES; <br /> The Contractor shall immediately give Notice to the City or City's Representative as <br /> provided in this section and elsewhere in the Contract Documents and Specifications. <br /> Timely and adequate Notice is a condition precedent to a Contract Claim. <br /> Requests for extensions of Contract Time shall be made and evaluated in accordance <br /> with 1-08.3 PROGRESS SCHEDULE and 1-08.8 EXTENSIONS OF TIME. <br /> Irrespective of any request for additional compensation or Contract Time or a Contract <br /> Claim that Work is extra and not part of the original scope of Work, the Contractor shall <br /> proceed expeditiously and promptly with the Work as the City orders. <br /> If the Contractor fails to follow the procedures of this Contract, including failing to give <br /> Notice, the Contractor completely waives any Contract Claims. In its sole discretion, the <br /> City may waive strict compliance with procedures, but any such waiver of one or more <br /> items or elements does not waive the necessity for Contractor's strict compliance with <br /> any other item or element, nor shall such waiver be admissible in any legal proceeding <br /> for any reason. <br /> 1-04.5(2) Form of Notice <br /> The Notice shall be in writing and include the following minimum information: <br /> 1. A complete and accurate description of the event(s) giving rise to the Notice, <br /> including dates, times, and locations; <br /> 2. A preliminary list of persons involved in such event; <br /> 3. A statement whether the Contractor believes the event may result in a <br /> Contract Claim for additional Contract Time or adjustment of the Contract <br /> Sum; <br /> 4. A date by which Contractor shall begin providing Supplemental Information as <br /> provided in this section. <br /> 1-04.5(3) Supplemental Information <br /> Contractor shall supplement the written Notice as soon as possible with a written <br /> statement providing the following: <br /> 1. The date of the event, incident, direction, instruction, interpretation or <br /> determination; <br /> 2. The nature and circumstances giving rise to the Notice; <br /> 3. The contract provisions relating to the event, incident, direction, instruction, <br /> interpretation or determination; <br /> 4. The estimated dollar cost, if any, of the Extra Work, Delay, change or <br /> disruption and detailing how the dollar amount estimate was determined; and <br /> I <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.