My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-10.3 Traffic Control Labor, Procedures and Devices 125 I <br /> 1-10.3 Flagging, Signs, and All Other Traffic Control Devices (******) 125 <br /> 1-10.4 Measurement 128 <br /> 1-10.4 Measurement 128 <br /> 1-10.5 Payment 129 <br /> 1-10.5 Payment (******) 129 III <br /> 1-11 MISCELLANEOUS (******) 129 <br /> 1-11.1 Construction 129 <br /> 1-11.2 Applicable Law and Choice of Forum 129 <br /> 1-11.3 Severability 129 <br /> 1-11.4 Headings for Convenience 129 <br /> 1-11.5 Waiver 129 <br /> 1-11.6 City of Everett Business License 129 <br /> 1-11.7 Compliance with Federal, State and Local Laws 129 J <br /> 1-11.8 Complete Agreement 130 <br /> 1-11.9 Successors Bound 130 <br /> 1-11.10 Effective Date 130 <br /> 1-11.11 Contractor Registration 130 <br /> DIVISION 2 - EARTHWORK 131 <br /> 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP 131 <br /> 2-01.2 Disposal of Usable Material and Debris 131 <br /> 2-01.4 Measurement 131 <br /> 2-01.5 Payment 131 <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 131 <br /> 2-02.1 Description 131 <br /> 2-02.3 Construction Requirements 131 <br /> 2-02.4 Vacant 134 <br /> 2.02.4 Measurement 134 <br /> 2-02.5 Payment 134 <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT 134 <br /> 2-03.1 Description 134 <br /> 2-03.2 Vacant 134 <br /> 2.03.2 Materials 135 <br /> 2-03.3 Construction Requirements 135 <br /> 2-03.4 Measurement 136 <br /> 2-03.5 Payment 136 I <br /> 2-04 HAUL 136 <br /> 2-04.1 Description 136 <br /> 2-04.3 Vacant 136 <br /> 2-04.3 Construction Requirements 136 <br /> 2-04.4 Measurement 136 <br /> 2-04.5 Payment 136 <br /> 2-07 WATERING 136 <br /> Watermain Replacement "U" Table of Contents - October 1, 2019 ' <br /> WO No.-UP3698 SP -iv <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.