Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Contractors surveyor in establishing line, grade and slopes for the construction wo rk. 1 <br /> Copies of these field notes shall be provided to the Engineer upon request and upon <br /> completion of the Contract Work; the field book shall be submitted to the Engineer and <br /> become property of the City. <br /> If the survey work provided by the Contractor does not meet the standards of the <br /> Engineer, then the Contractor shall, upon the Engineers written request, remove the <br /> individual or individuals doing the survey work and the survey work will be completed by <br /> the Engineer at the Contractors exp ense. Costs for completing the survey work required <br /> by the Engineer will be deducted from monies due or to become due the Contractor. <br /> The City may spot-check the Contractors surveying. These spot-checks will not change <br /> the requirements for normal checking and testing as described elsewhere, and do not <br /> relieve the Contractor of the responsibility of producing a finished product that is in <br /> accordance with the Contract. <br /> In all disputes concerning accuracy of lines and elevations, the City shall be assumed <br /> correct and the Contractor shall correct the discrepancies before construction work may <br /> proceed. No additional compensation will be paid for this corrective Work. <br /> Payment: The lump sum contract price for "Surveying" shall be full pay for all costs <br /> involved in furnishing all labor, tools, survey instruments, materials, and other equipment <br /> necessary for the setting and maintaining of the alignment and grade as specified. <br /> 1-05.6 Inspection of Work and Materials <br /> Supplement 1-05.6 by adding the following: <br /> 1-05.6(1) Demonstration of Compliance with Contract Requirements <br /> The burden of proving the constructed Work complies with the Contract Documents shall <br /> be on the Contractor at all times. The Contractor shall grant the City's Representative <br /> access to the Work and work site and to places where Work is being prepared, or where <br /> materials, Equipment, or machinery are being obtained for the Work. The Contractor <br /> shall provide information requested by the City's Representative in connection with <br /> inspection work. <br /> If the Contract Documents, laws, ordinances, or public regulatory authority requires parts <br /> of the Work to be specially inspected, tested, or approved, the Contractor shall give the <br /> City's Representative be not less than two working days prior written Notice of the <br /> availability of the subject Work for examination. <br /> Inspection and quality control tests performed on the Contractor's work by the City's <br /> Representative shall not relieve the Contractor of its responsibility for errors or lack of <br /> quality therein and shall not be regarded as an assumption of risks or liability by the <br /> City's Representative for the Contractors compliance with these Contract Documents. <br /> Contractor remains responsible and liable for all errors, defects or a lack of quality not <br /> discovered by inspection or observation. <br /> 1-05.6(2) Manufacturers Directions <br /> Manufactured articles, material and Equipment shall be transported, stored, applied, <br /> installed, connected, erected, adjusted, tested, operated and maintained as <br /> recommended by the manufacturer, unless otherwise specified in these Special <br /> Provisions. Provide manufacturers installation instructions and procedures to the City <br /> prior to installation of the manufactured articles, material and Equipment. <br /> I <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—64 I <br />