My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT V T S PECIAL PROVISIONS <br /> ' enforce such provisions. Provided, however, in the event a Contractor becomes <br /> involved in, or is threatened with, litigation with a Subcontractor or supplier as a <br /> ' result of the foregoing direction, the Contractor may request that the City or the <br /> United States to enter into such litigation to protect their respective interests. <br /> 1-07.14 Responsibility for Damage <br /> ' Delete 1-07.14 and replace with the following: <br /> The City, and all officers and employees of the City, including but not limited to those of <br /> the Public Works Department, will not be responsible in any manner: for any loss or <br /> damage that may happen to the Work or any part; for any loss of material or damage to <br /> any of the materials or other things used or employed in the performance of Work; for <br /> injury to or death of any persons, either workers or the public; or for damage to the public <br /> for any cause which might have been prevented by the Contractor, or the workers, or <br /> anyone employed by the Contractor. <br /> The Contractor shall be responsible for any liability imposed by law for injuries to, or the <br /> ' death of, any persons or damages to property resulting from any cause whatsoever <br /> during the performance of the Work, or before Final Acceptance. <br /> Subject to the limitations in this Section, and RCW 4.24.115, the Contractor shall <br /> indemnify, defend, and save harmless the City and all its officers and employees from <br /> all claims, suits, or actions brought for injuries to, or death of, any persons or damages <br /> resulting from construction of the Work or in consequence of any negligence or breach <br /> ' of Contract regarding the Work, the use of any improper materials in the Work, caused <br /> in whole or in part by any act or omission by the Contractor or the agents or employees <br /> of the Contractor during performance or at any time before final acceptance. In addition <br /> ' to any remedy authorized by law, the City may retain so much of the money due the <br /> Contractor as deemed necessary by the Engineer to ensure the defense and <br /> indemnification obligations of this Section until disposition has been made of such suits <br /> or claims. <br /> ' Pursuant to RCW 4.24.115, such claims, suits, or actions result from the concurrent <br /> negligence of (a) the indemnitee or the indemnitee's agents or employees and (b) the <br /> Contractor or the Contractor's agent or employees, the indemnity provisions provided in <br /> the preceding paragraphs of this Section shall be valid and enforceable only to the extent <br /> of the Contractor's negligence or the negligence of its agents and employees. <br /> The Contractor shall bear sole responsibility for damage to completed portions of the <br /> ' project and to property located off the project caused by erosion, siltation, runoff, or <br /> other related items during the construction of the project. The Contractor shall also <br /> bear sole responsibility for any pollution of rivers, streams, ground water, or other <br /> waters that may occur as a result of construction operations. <br /> The Contractor shall exercise all necessary precautions throughout the life of the Project <br /> to prevent pollution, erosion, siltation, and damage to property. <br /> The City will forward to the Contractor all claims filed against the City that are deemed <br /> to have arisen in relation to the Contractor's Work or activities under this Contract, and, <br /> in the opinion of the City, are subject to the defense, indemnity, and insurance provisions <br /> of the Contract Documents. Claims will be deemed tendered to the Contractor and <br /> insurer, who has named the City as a named insured or an additional insured under the <br /> Contract's insurance provisions, once the claim has been forwarded via certified mail to <br /> ' the Contractor. The Contractor shall be responsible to provide a copy of the claim to the <br /> Contractor's designated insurance agent who has obtained/met the Contract's insurance <br /> provision requirements. <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> ' WO No—UP3698 SP—81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.