My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshland Flood Control District 10/8/2019
>
Contracts
>
6 Years Then Destroy
>
2024
>
Marshland Flood Control District 10/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:11 AM
Creation date
1/9/2020 10:15:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshland Flood Control District
Approval Date
10/8/2019
Council Approval Date
10/2/2019
End Date
12/31/2024
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Marshland Flood Control District ILA
Tracking Number
0002155
Total Compensation
$175,000.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.3 Anticipated Pump Electricity Operating Costs Attributable to Increased <br /> Hillside Runoff <br /> Once the parties have calculated the District's anticipated Pump Electricity Operating <br /> Costs for a given calendar year pursuant to Section 5 above, the parties shall compute the <br /> dollar amount of those anticipated costs that is attributable to Increased Hillside Runoff from <br /> the Upland Area(the "Increased Hillside Runoff Pump Electricity Operating Costs"). For <br /> purposes of this Agreement, the parties agree the currently available data, using the <br /> methodology described on Exhibit F to this Agreement, demonstrate that an average of <br /> twenty-three and two-tenths percent(23.2%) of the District's Pump Electricity Operating <br /> Costs are attributable to additional surface water flow that comes into the Marshland <br /> Drainage Basin from Increased Hillside Runoff. Accordingly, the Increased Hillside Runoff <br /> Pump Electricity Operating Costs for a given calendar year during the term of this <br /> Agreement shall be equal to twenty-three and two-tenths percent(23.2%) of the District's <br /> total anticipated Pump Electricity Operating Costs for that calendar year. <br /> 6.4 Increased Hillside Runoff Operating Costs <br /> Once the anticipated (i) Increased Hillside Runoff Ditch, Pond and Canal Operating <br /> Costs, (ii) Increased Hillside Runoff Pump Plant O&M Operating Costs, and(iii) Increased <br /> Hillside Runoff Pump Electricity Operating Costs for a given calendar year have each been <br /> calculated as described above, those three amounts shall be summed to obtain the total <br /> anticipated"Increased Hillside Runoff Operating Costs"for the calendar year at issue as set <br /> forth by example in Exhibit G to this Agreement. <br /> 7. CALCULATING THE COUNTY'S AND THE CITY'S PROPORTIONATE <br /> SHARES OF INCREASED HILLSIDE RUNOFF OPERATING COSTS <br /> 7.1 County's Proportionate Share <br /> As stated in Recital J, as of the Effective Date of this Agreement, the County Upland <br /> Area contains approximately seventy percent(70%) of the total impervious surface in the <br /> Upland Area. Accordingly,the County's proportionate share of the Increased Hillside <br /> Runoff Operating Costs for a given calendar year shall be equal to seventy percent(70%) of <br /> the Increased Hillside Runoff Operating Costs for the calendar year at issue. <br /> 7.2 City's Proportionate Share <br /> As stated in Recital J, as of the Effective Date of this Agreement,the City Upland <br /> Area contains approximately thirty percent(30%) of the total impervious surface in the <br /> Upland Area. Accordingly,the City's proportionate share of the Increased Hillside Runoff <br /> Operating Costs for a given calendar year shall be equal to thirty percent(30%) of the <br /> Increased Hillside Runoff Operating Costs for the calendar year at issue. <br /> INTERLOCAL AGREEMENT REGARDING INCREASED HILLSIDE RUNOFF IN pg. 8 <br /> THE MARSHLAND DRAINAGE BASIN DUE TO UPLAND DEVELOPMENT 09/09/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.