My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:08:23 AM
Creation date
1/9/2020 11:06:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA <br /> 12:30 P.M., WEDNESDAY, JANUARY 22, 2014 <br /> CITY COUNCIL CHAMBERS <br /> Roll Call <br /> Pledge of Allegiance <br /> Approval of Minutes: January 15, 2013 <br /> Mayor's Comments <br /> Council Comments <br /> City Attorney <br /> Citizen Comments <br /> COUNCIL BRIEFING AGENDA: (These items come before the City Council serving as <br /> a Council Committee of the Whole and are likely to be scheduled at a future meeting.) <br /> (1) CB 1401-01 — 1st Reading — Adopt Proposed Ordinance amending the interim <br /> zoning regulations established under Ordinance No. 3314-13 for the Silver Lake <br /> Center property by extending the interim regulations for an additional six <br /> months, and declaring and emergency to exist (3rd and final and public hearing <br /> on 2-5-14) <br /> (2) Authorize the Mayor to sign Water Pollution Control Facility Expansion — Phase <br /> Cl General Contractor/Construction Manager Contract with IMCO General <br /> Construction in the amount of $1,909,989.16 including Washington State Sales <br /> Tax <br /> CONSENT ITEMS: <br /> (3) Adopt Resolution No. authorizing claims against the City of Everett in the <br /> amount of $3,863,879.56 for the period of January 4, 2014 through January 10, <br /> 2014 <br /> ACTION ITEMS: <br /> (4) Authorize the Mayor to sign the Professional Services Agreement with Krazan & <br /> Associates, Inc. to provide geotechnical engineering design services for <br /> Watermain Replacement"0" Project in the amount of $8,040.77 <br /> (5) Award the construction contract for the Evergreen Way and Pecks Drive- <br /> Intersection Safety project to Faber Construction Corp. in the amount of <br /> $256,905.09 including Washington State Sales Tax and at no cost to the City <br /> AGENDA CONTINUED ON BACK OF THIS PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.