Laserfiche WebLink
9 <br /> Attachment 2 to GC/CM Contract—Phase Cl Total Contract Cost Summary <br /> General Contractor/Construction Manager Services for <br /> ;.- ;;- Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> ATTACHMENT 2 — PHASE Cl TOTAL CONTRACT COST SUMMARY <br /> Bid Package# <br /> (or CSI modified <br /> Uniformat#) Description of Bid Package or CSI modified Uniformat) Amount <br /> 100 Concrete Piles $ 1,525,258.08 <br /> $ <br /> 1 Total for Subcontract Costs $1,525,258.08 <br /> 2 Negotiated Support Services $0 <br /> 3 Risk Contingency(2.5% x Total for Subcontract Costs above) $38,131.45 <br /> Maximum Allowable Construction Cost(MACC) <br /> 4 • <br /> (Add Lines 1, 2, and 3) $1,563,389.53 <br /> 5 Percent Fee (3.8% x MACC above)' $59,409.80 <br /> 6 Fixed Amount for Specified General Conditions $126,275.00 <br /> Total Contract Cost(TCC) <br /> 7 (Add Lines 4, 5, and 6) $1,749,074.33 <br /> 8 Washington State Sales Tax(WSST) (9.2%) $160,914.83 <br /> Total Contract Cost(TCC) <br /> plus WSST <br /> 9 (Add Lines 7 and 8) $1,909,989.16 <br /> City of Everett Page 1 of 1 December, 2013 <br /> Water Pollution Control Facility Expansion 38 <br />