My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:08:23 AM
Creation date
1/9/2020 11:06:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 4 <br /> PROJECT TITLE: <br /> Professional Services Briefing COUNCIL BILL# <br /> Agreement with Krazan& Proposed Action Originating Department PW/Utilities <br /> Associates, Inc.to provide Consent Contact Person Richard Hefti <br /> geotechnical engineering Action Phone Number 425-257-7215 <br /> design services for Watermain First Reading FOR AGENDA OF Jan. 22,2014 <br /> Replacement"0"Project Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Rockefeller Ave— 2 signed PSAs PW <br /> Hewitt Ave to Everett Location Map <br /> Ave - <br /> Amount Budgeted $450,000 <br /> Expenditure Required $8,040.77 Account Number(s): UP 3575 <br /> Budget Remaining $441,959.23 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Watermain Replacement"0" will replace approximately 900 feet of existing 6-in. diameter cast iron pipe <br /> along Rockefeller Avenue from Hewitt Avenue to Everett Avenue with new 8-inch ductile iron pipe. The <br /> need for this project is to replace old 1950 era cast iron pipe with a history of recent main breaks. <br /> Ci ,.s ,aff will be designing this project in-house this year and will need geotechnical information in order to <br /> pftbri plans and specifications for bidding in the spring of 2014. <br /> The project is scheduled for-construction in summer of 2014. <br /> • <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign a Professional Services Agreement with Krazan&Associates, Inc to provide <br /> geotechnical engineering design services for Watermain Replacement"0"Project in the amount of <br /> $8,040.77. <br /> 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.