My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:08:23 AM
Creation date
1/9/2020 11:06:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br /> Compensation. <br /> Project: Date: <br /> Watermain Replacement 0-UP3575 7-Jan-14 <br /> Service Provider: <br /> Krazan&Associates, Inc <br /> Direct Salary Cost(DSC) <br /> Classification Man Hours Rate Cost <br /> Sr Geotechnical Engineer 2 $36.784 $73.57 <br /> Enginnering&Analysis 16 $22.070 $353.12 <br /> Project Engineer/Geologist 16 $22.070 $353.12 <br /> Field Engineer Geologist 12 $22.070 $264.84 <br /> Drafting 8 $18.390 $147.12 <br /> Total DSC $1,191.77 <br /> Overhead(OH Cost including Salary Additives) <br /> OH Rate x DSC of 141.9% x $1,191.77 = $1,690.74 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.0% x $1,191.77 = $357.53 <br /> Subtotal $3,240.04 <br /> Reimbursables <br /> Laboratory Testing $500.00 <br /> Drilling Rig(Cost+5%) $2,147.01 <br /> Traffic Plan, Flaggers <br /> (Cost+5%) $1,623.72 <br /> Concrete Coring(Cost <br /> +5%) $630.00 <br /> Total Reimbursables $4,900.73 <br /> Grand Total-Compensation $8,140.77 <br /> 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.