Laserfiche WebLink
Exhibit D <br /> Compensation. <br /> Project: Date: <br /> Watermain Replacement 0-UP3575 7-Jan-14 <br /> Service Provider: <br /> Krazan&Associates, Inc <br /> Direct Salary Cost(DSC) <br /> Classification Man Hours Rate Cost <br /> Sr Geotechnical Engineer 2 $36.784 $73.57 <br /> Enginnering&Analysis 16 $22.070 $353.12 <br /> Project Engineer/Geologist 16 $22.070 $353.12 <br /> Field Engineer Geologist 12 $22.070 $264.84 <br /> Drafting 8 $18.390 $147.12 <br /> Total DSC $1,191.77 <br /> Overhead(OH Cost including Salary Additives) <br /> OH Rate x DSC of 141.9% x $1,191.77 = $1,690.74 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.0% x $1,191.77 = $357.53 <br /> Subtotal $3,240.04 <br /> Reimbursables <br /> Laboratory Testing $500.00 <br /> Drilling Rig(Cost+5%) $2,147.01 <br /> Traffic Plan, Flaggers <br /> (Cost+5%) $1,623.72 <br /> Concrete Coring(Cost <br /> +5%) $630.00 <br /> Total Reimbursables $4,900.73 <br /> Grand Total-Compensation $8,140.77 <br /> 58 <br />