My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:08:23 AM
Creation date
1/9/2020 11:06:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- EVERETT CITY COUNCIL AGENDA I lEM COVER SHEET <br /> PROJECT TITLE: <br /> Water Pollution Control Facility Briefing COUNCIL BILL# <br /> Expansion-Phase Cl General Proposed Action Originating Department Public Works <br /> Contractor/Construction Consent Contact Person John Nottingham <br /> Manager Contract with IMCO Action Phone Number (425) 257-8872 <br /> General Construction First Reading FOR AGENDA OF 1/22/2014 <br /> Second Reading • <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA (e\ <br /> Council President W M <br /> Location Preceding Action Attachments Department(s) Approval <br /> Smith Island Approval by Council for WPCF Expansion Phase Public Works,Legal <br /> IMCO Preconstruction Cl GC/CM Contract <br /> Services on 10/30/2012 <br /> Amount Budgeted $76,700,000 <br /> Expenditure Required $1,909,989 <br /> Budget Remaining $71,255,828 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Water Pollution Control Facility Expansion—Phase C encompasses three construction phases, a liquid <br /> stream expansion(Phase C1)and two solids handling expansions(Phase C2 & C3). This contract with the <br /> City's approved General Contractor/Construction Manager,IMCO General Construction,represents the <br /> material procurement and installation of the concrete piling for Phase Cl. This portion of the work has been <br /> bid early to expedite the construction schedule. City Staff is negotiating the Maximum Allowable <br /> Construction Costs for the entire Phase Cl project per RCW Chapter 39.10. Upon completion of these <br /> negotiations, an amendment to this contract for the remaining scope and costs of the entire Phase Cl <br /> construction will be brought to Council. The total estimated cost of Phase Cl is$31,000,000. <br /> RECOMl1'IENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign Water Pollution Control Facility Expansion-Phase Cl General <br /> Contractor/Construction Manager Contract with IMCO General Construction in the amount of$1,909,989.16 <br /> including Washington State Sales Tax. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.