My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/01/29 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/01/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:13:18 AM
Creation date
1/9/2020 11:10:51 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/29/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- . GC/CM Contract 7 <br /> General Contractor/Construction Manager Services for <br /> Eva - r Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> litigation, jurisdiction and venue shall be in the Superior Court in and for the <br /> County of Snohomish. <br /> 8.6. Insurance: The GC/CM shall maintain in force all insurance coverage as <br /> required by law or otherwise required in the Contract Documents. <br /> 8.7. Entire Agreement: This Contract, including its attachments and documents <br /> incorporated by reference, constitutes the full and entire understanding and <br /> agreement between the Parties for performance of the Work. This Contract <br /> may not be modified in any manner whatsoever without the express written <br /> consent of the Owner, and the express written consent of the GC/CM. <br /> 8.8. Notices: Notices required in this Contract shall be in writing and either hand <br /> delivered during normal business hours, or sent by registered or certified mail, <br /> postageprepaid, to the following addresses, consistent with the General <br /> Conditions: <br /> City of Everett IMCO General Construction, Inc. <br /> 3200 Cedar Street 2116 Buchanan Loop <br /> Everett, WA 98201 Ferndale, WA 98248 <br /> Attn: Attn: <br /> 8.9. Project Manager: The Owner has designated John Nottingham, P.E. as the <br /> Project Manager. The Project Manager may designate other individuals to <br /> act on the Owner's behalf. <br /> 8.10. Survivability: See General Conditions Section 17.03. <br /> 8.11. Severability: If any portion of this Contract is found to be invalid by the <br /> Superior Court of Snohomish County, such invalidation of such portion shall <br /> not invalidate the remaining portions of the Contract, and they shall remain in <br /> full force and effect as written. <br /> 8.12. Waiver: Failure by Owner to require or enforce any provision of this Contract <br /> shall not constitute a waiver or release by Owner of any rights or remedies, or <br /> to require contractual performance by GC/CM. <br /> 8.13. Indemnification: See General Conditions Article 6.19. <br /> City of Everett Page 24 of 25 December, 2013 <br /> Water Pollution Control Facility Expansion <br /> 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.