Attachment 3 to GC/CM Contract—Detailed Breakdown of Total for Subcontract Costs <br /> General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> ATTACHMENT 3 — DETAILED BREAKDOWN OF TOTAL FOR SUBCONTRACT COSTS <br /> Bid Estimated Unit of <br /> Item Description Quantity Measure Unit Price Total Amount <br /> Mobilization. Pricing shall not exceed 5%of Lump <br /> 1 Total Base Bid. 1 Sum 76,000.00 $76,000.00 <br /> • <br /> Supply and Install Test Piles(6ea)including <br /> Pile Cutoff and Disposal. Pricing shall not Lump <br /> 2 exceed 10%of the Total Base Bid 1 Sum 86,000.00 $86,000.00 <br /> Supply Concrete Piles including,but not <br /> limited to,delivery and unloading. Actual <br /> Quantity will be based on the final lengths of Lineal <br /> 3 pile based on the Test Pile Program. 16,906 Foot $59.80 $1,010,978.80 <br /> Install Concrete Piles. Actual Quantity will be <br /> based on installed pile length from pile tip to <br /> pile cutoff rounded to the nearest foot. Unit <br /> price includes,but is not limited to,material <br /> handling,predrilling,pile driving,pile cutoff Lineal <br /> 4 and disposal,and demobilization. 16,906 Foot $17.88 $302,279.28 <br /> Estimated <br /> Bid Allowance for Obstructions and Amount for <br /> Unforeseen Conditions. Extra Work to be Time and <br /> Performed on a Time and Expense Method Expense <br /> 5 per the General Conditions Article 10.06. 1 Method $50,000.00 $50,000.00 <br /> 6 TOTAL FOR SUBCONTRACT COST $1,525,258.08 <br /> City of Everett Page 1 of 145 December, 2013 <br /> Water Pollution Control Facility Expansion <br />