�. „ � f� ; � ' ! I" '�'!'��IIIII'1t�I��"'_- - , , _ _ __ _ _ _ _ __
<br /> 18-015SPEC REV 1 90% :
<br /> 01 31 00-PROJECT MANAGEMENT AND COORDINATION :
<br /> _ _ i' �:�.
<br /> ::��`.
<br /> A. GENERAL COO_RDINATION .
<br /> 1. The Contractor shall be in charge of this Contract and tkje Project, as well 3. Establish "hot-works" fire safety precautions required foc performance of 1, Steel Framing and Furring:
<br /> 2.. . Tensile Strength: 1,600 psi perASTM C 307. Q. CURING, PROTECTING,AND CLEANING �t'
<br /> Clark Dietrich inc. 3. Fiexural Strength: 4,000 psi per ASTM C 580. 1, Cure resinous.flooring materials in compliance with manufacturer's
<br /> as directing .and scheduling of all Work. Final responsibi�ity for the Work. �
<br /> performance, interface, and completion .of the Project shall be the
<br /> Steeler 4. Water Absorption: < 1% per ASTMiC 413. directions, taking care to prevent contamination during stages of
<br /> G. PERFORMANCE or Approved Equal 5. Impact Resistance: > 160 in.Ibs. per ASTM D 2794. application and prior to completion of curing process. Close area of
<br /> Contractor's. 6. Flammability: Class 1 per,ASTM E-'�648. application for a minimum of 18 hours.
<br /> r nd their relationshi with 1. Execute cutting and patching work in a manner to avoid damage to other 2 Water Resistant Gypsum Wall Board: TM D 2240: 2. Protect resinous flooring materials from damage and wear during
<br /> 2. Anticipate interrelationship of all Subcontracto s a p 7. Hardness: 85 to 90,Shore D per AS ,
<br /> the total Work.
<br /> work;Provide proper surfaces for installation of new work;and provide a Georgia-Pacific Corp. ,
<br /> Bond uildin Products Div. National G sum Co. construction operation. Where temporary covering is required for this
<br /> 3. Resolve differences or dis utes between Subcont
<br /> ractors and materials neat transition from existing finishes to new work. Gold B g yp
<br /> p G. PATCHING AND FILL MATERIAL Resino'us product of or approved by resinous purpose, comply with manufacturer's recommendations for protective
<br /> uct conduit and other United States G sum Co.
<br /> r exfent of the Work. 2 Fit new work to existing pipes, sleeves, d s, YP floorin manufacturer and recommended by manufacturer for application materials and method of application. General Contractor is xesponsible
<br /> suppliers concerning coordination, interference, o ,
<br /> enefrations throu h surface. or Approved Equal - g for protection and cleaning of surfaces after final coats.
<br /> Contractor's decisions, if consistent with Contract Document P. 9 indicated.
<br /> requirements,shall be finaL
<br /> 3. For all new work made to existing work under warranty, employ original 3. Cleaning: Remove temporary covering and clean resinous flooring just
<br /> inst Iler or fabricator to erform cuttin and atchin unless otherwise C. . STEEL FRAMING FOR WALLS AND PARTITIONS H. JOINT SEALANT: Type recommended� or produced by resinous flooring prior to final inspection. . Use cleaning materials and procedures.
<br /> 4. Cooperation wi4h other contractors during the term of this Project may be a P 9 P 9 _
<br /> a roved b` the Owner. 1. Steel Studs and Runners:ASTM C 645. manufacturer for type of service and joint condition indicated. Include allowances recommended by resinous flooring manufacfurer.
<br /> required within the_building or other adjacent locations to the construction pP Y `
<br /> fo the s ecified installation of new work and 2. Depth: As indicated on Drawings for Stonflex MP7 joint fill material, and CT5 concrete crack treatment. '
<br /> limits of this Project. The Contractor is to cooperate vuith the Owner in 4. . P�epare surtaces to provide r p :
<br /> coordinetion of all work to prevent impact to this or other Owner sponsored finishes.
<br /> 3. Protective Coating:ASTM A 653lA 653M, G60(Z180) hot-dip galvanized. 09 91 23-INTERIOR PAINTING �
<br /> 5 Remove and re lace or re air unsuitable substrate materials for new 4. Flat Strap and Backing Plate: Steel sheet for blocking and bracing in
<br /> construction ro ects, �
<br /> _ P 1 p : P length and width indicated. . �. PREPARATION A. MANUFACTURERS: Subject to compliance with requirements, provide products �l
<br /> 5. The Contractor will cooperate with the Owner in coordination of all work to applications. 5. Cold-Rolled Channel Bridging: D.0538-inch (1.37-mm) bare-steel
<br /> b cuttin and _ 1. General: Prepare and clean substrates according to resinous flooring by one of the following:
<br /> avoid impacts to the Owner's operations. 6. Restore existing building systems that are impacted y 9 thickness,with minimum 1/2-inch-(12.7-mm-)wide flanges.
<br /> n itio s: manufacturer's written insfructions for substrate indicated: Provide clean, 1. Benjamin Moore&Co.,Glidden or Approved EquaL
<br /> patching work to original operating co d n 6. Clip Angle: Not less than 1-1/2 by 1-1/2 inches(38.1 by 38.1 mm),0.068-
<br /> dry,and neutral Ph substrate for resinous flooring application.
<br /> 7. For enetrations cut in existin fire-rated separations,completely seal new _ - m thick a vanized steeC
<br /> B. SPECIAL COORDINATION P g inch (1.73 m ) ,g I 2. Concrete Substrates; Provide sound concrete surfaces free of laitance, g. VOC CONTENT: Products shall comply with VOC limits of authorities having
<br /> r ed
<br /> work with fire-sto in materials to full thickness of the penet at 7, Resilient Furrin Channels: 1/2-inch- 12.7-mm- deep, steel sheet m �unds form-release a ents dust dirt, ' i nd f r interior aints and coatin s a lied at Pro'ect 5ite,the following
<br /> 1: The Contractor is responsible for receiving, unload�ng, storage and PP 9 9 � ) glaze, efflorescence, curing co po , g jurisdict on a , o p 9 pp 1 .
<br /> f he element. members designed to reduce sound transmission. : rease oil and other contaminants incompatible with resinous flooring: VOC limits,exclusive of colorants added to a tint base,when calculated according
<br /> handling of Owner Furnished Contractor Insta►led (OFCI) items rom t
<br /> 8. Re lace existin fire-sto in materials when disturbed b new work. g
<br /> ' time of recei t throu h Substantial Completion. p 9 PP 9 Y 3. Mechanically prepare substrates as follows: to 40 CFR 59,Subpart D(ERA Method 24): ,
<br /> P 9
<br /> Exi tin 9. Remove debris and abandoned ifems from the work area, including from D. GYPSUM WALL BOARD: Provide gypsum boaPd in maximum lengths available Shot-blast surfaces with an apparatus that abrades the concrete surface, 1. Fiat Paints and Coatings: 50 glL. .
<br /> 2. The Contractor is responsible for protecting OFCI and Owner s g �
<br /> concealed s aces. to minimize end joints. Thickness, 5/8 inch unless otherwise indicated. ASTM C contains the dispensed shot within the apparatus,and recirculates the shot 2. Non-flat Paints and Coatings: 150 g/L.
<br /> Contractor Installed (OECI) items from damage, such'as: damage from p 36,ta ered ed es. T e X.
<br /> � sure to the elements� or from .dama e to a warrant due to P g yp by vacuum pickup. Comply with ASTM C 811 3. Anticorrosive and Antirust Paints Applied to Ferrous Metals:250 g/L.
<br /> expo 9 Y
<br /> nd testin . The costs to re air or 02 41 00-SELECTIVE DEMOLITION 4. Repair damaged and deteriorated concrefe according to resinous flooring 4. Zinc-Rich lndustrial Maintenance Primers:340 g/L.
<br /> Contractor's improper installation a g p '
<br /> E. TRIM ACCESSORIES: ASTM C 840, Manufacturer's standard trim accessories, manufacturer's written recommendations.
<br /> replace items damaged while in the Contractor's possession shall be '
<br /> borne b the Contractor. A. GENERAL
<br /> including corner bead and edge trim of beaded type with face flanges for 5. Verify that concrete subst'r.ates are dry. C. PRIMERS/SEALERS
<br /> y I' i n concealment in joint compound except where semi-finishing or exposed type is a. Perform in situ robe test,ASTM F 2170. Proceed with a lication `,
<br /> 1. Contractor is res onsible for determinin scope and extent of demo it o P PP 1. Primer Sealer, lnterior, Institutional Low Odor/VOC,Wate�based.
<br /> 3. The Contracto� shall consult with the Owner to determine the warranty p 9 indicated. Provide corner bead formed from zinc ailoy.
<br /> requirements of OFCI and OECI items.
<br /> in ,order to allow for installation of the work shown on the Drawings. only after substrates do not exceed a maximum potential 2: Metal Primer;Water based. � £ A
<br /> - S ecific demolition notes are indicated on the Drawin s that are in addition equilibrium relative humidity of 75 percent. t t�
<br /> a. Coordinate with work of other Contractors. p g F. GYPSUM BOARD JOINT TREATMENT b. Perform anhydrous calcium chloride test, ASTM F 1869. Proceed p. INTERIOR PAINTS
<br /> to the Contractor's required scope to accommodate the new work. � �
<br /> b. Coordinate with building occupants. 1. Materials: ASTM C 475 and ASTM G 840, com I in with
<br /> p Y 9 with application only after substrates have maximum moisture- 1. Gypsum Drywall System,(Walls and Ceilings): Latex Satin Finish:Two
<br /> 2. Contractor is wamed that there may be unknown alterations and sum board and 'oint > va or-emission rate of 3 Ib.of water/1000 s .ft.of s�ab in 24 hours. finish coaEs over rimer. Total dr film thickness not less than 5.0 mils.
<br /> c. Coordinate with Owner`s.environmental services staff. recommendations of Manufacturer of both gyp � p q P Y
<br /> ' unforeseen or u�known conditions above existing ceilings,behind existing
<br /> d. Coordination with Owner's security services. treatment materials for application indicated. c. Perform additional �moisture��tests recommended b manufacturer.
<br /> r la s and within existin walls and Y 2. Gypsum Drywall System,(Walls and Ceilings where noted in Drawings):
<br /> wall furring, below conc�ete floo s b , 9 � 2, Finish: Level 4. Proceed with application only after substrates pass testing. Latex Semi Gloss Finish:Two finish coats over primer,with total dry film
<br /> O D NATION partitions. 6. Verify that concrete substrates have neutral Ph and that resinous flooring thickness not less than 5.0 mils.
<br /> C. MECHANICAL AND ELECTRICAL CO R I
<br /> 3. Refer to Mechanical and Electrical drawings and specifications for will adh�[e to them. Perform tests .recommended by manufacturer. 3. Ferrous Metal,Semi-Gloss Finish:Two finish coats over primer,with total
<br /> 1. Resolve all tight or restricted conditions involving work of various sections 09 50 00-ACOUSTICAL PANEL CEILINGS
<br /> in advance of installation. Coordinate the Work of all trades to ensure that - additional requirements. Proceed with application only after�substrates pass testing. dry film thickness not less than 5.0 mils. ,
<br /> 4. Demolition work includes protection of existing cons4ruction to remain, as ss A materials. Ceilin Sus ension S stems
<br /> all fixtures;devices,switches, outlets, ducts, pipes, and similar items can A. STANDARD: ASTM E 1264 for Cla g p Y
<br /> be installed as shown.
<br /> well as removal and disposal of demolished materials. ASTM C 635. J. RESINOU$ MATERIALS: Mix corriponents and prepare materials according to E. EXAMINATION: Examine substrates and conditions, with Applicator present, for
<br /> 5. Salva e: Owner will mark and retain salvageable items as determined resinous flooring manufacturer's written instructions. corripliance with requirements for maximum moisture content and other conditions
<br /> 9
<br /> ON SYSTEM 1. Use patching and fill material to fill holes and depressions in affecting performance of the Work. .
<br /> D. JOB SITE FIELD.MEASUREMENTS AND TEMPLATES . with the Contractor. B, ATTACHMENT DEVICES FOR SUSP�NSI i , ~
<br /> _ su ort members: Provide sizes ca able of substrates according to manufacturer's written instructions. 1. Maximum Moisture Content of .Substrates: When measured with an �` �::
<br /> 1. Obtain field measurements re uired for accurate' fabrication and 1. Anchors and intermediate pp p ,
<br /> Q ^
<br /> I with a licable re uirements of he lo d-car� in ca abilities shown in ASTM C 635, 2. Treat control joints and ',other nonmoving substrate cracks to prevent electronic moistute meter as follows:
<br /> installation of work included in the Contract Documents. Exact A. Requirements of Regulatory Age.ncies Comp y pp q sustaining 5 times t a y g p
<br /> ain rules, regulations,laws,ordinances of governing authorities. Table 1,"Direcf Hung"column.
<br /> cracks from reflecting' through resinous flooring according to . . a. Concrete: 12 percent. '`'�' +
<br /> measurements are the Contractor's responsibility. �urnish or obt
<br /> manufacturer's written recommendations.Allowances should be included b. Masonry(Clay and CMU): 12 percent. �Fy
<br /> - e lates atterns and settin instructions as re uired for installation of 2. Deck inserfs and hanger clips: Fabricate from hot-dip galvanized steeL � c. Wood: 15 ercent.
<br /> t mp , p g 9 ~ for Stonflex MP7 joint fil!material. P ,
<br /> all work: Verify in field.
<br /> - B. PROJECT CONDITIONS: . Owner will be continuously occupy the building Hanger wire: Zino-coated (galvanized) carbon steel wire, ASTM A 641,
<br /> ' mediatel ad�acent to areas of selective demolition. Conduct demolition work in so tem er with Class 1 coatin minimum 12 au e 0.106 inch , d. Gypsum Board: 12 percent.
<br /> im y � ft p , 9� g 9 � M. APPLICATION: A I com onents of resinous floorin s stem accordin to 2. G sum Board Substrates: Verif that finishin com ound is sanded
<br /> a manner that will not disrupt Owner's operations, diameter . pP Y p , g Y 9 YP Y 9 P _
<br /> E.' RECORD DRAW INGS: Maintain black line prints of the bid set Contract Drawings ) manufacturer's written instructions to produce a uniform, monolithic wearing smooth.
<br /> i s o show new information that surface of thickness indicated. 3. Rlaster Substrates;Verify that plaster is fully cured.
<br /> and approved Shop Drawings. Mark the draw ng t
<br /> ` C. EXISTWG BUILDING EXITS: Contractor's materials and activities shall not block tron "Cerama uard 605� S uare la -in, 15/16 in.; �
<br /> in s and on the a roved Sho Drawin s C. Acoustical Ceiling Tile: Arms g g , q Y 1. Coordinate application of components to provide optimum adhesion of 4. Verify suitability of .substrates, including surface conditiohs and ,
<br /> was not 5hown on the bid set Draw g , pp. p 9 �
<br /> any exit or impair floor-to-floor separation while the building is occupied. 4 x 48x 5 8 in�40 CAC or a roved e uaL :
<br /> 'on wh re the installation varies substantiyel from the - 2 � PP 4 resinous flooring system to substra,te, and optimum intercoat adhesion. compatibility with existing finishes and primers. Proceed with coating
<br /> i�cluding the actual ins#allati e Y application only after unsatisfactory conditions have been corrected.
<br /> work as ori inall shown. Mark drawings to show conditions fully and accurately.
<br /> 9 y D. PARTIAL REMOVAL: Items of salvaged value to Contractor may be removed from
<br /> - at t e corres ondin D. Grid, Ed e Moldings and Trim: Existing to remain. m on nts accordin to manufacturer's written Application of coating ind,icates acceptance of surFaces and conditions.
<br /> Where Shop Drawings are used, record a cross reference h p g 9
<br /> st�ucture as work progresses: Salvaged items must be transpo�ted from site as 2. Cure resinous flooring co p e � g
<br />; location on the Drawin s. Give articular attention to concealed elements that will ' m on site will not be ermitted. instructions. Prevent contamination during application and curing ove hardware covers lates and similar items alread in
<br /> 9 P. they are removed. Storage of removed ite s p
<br /> be difficult to measure and record at a later date. 09 67 23-RESINOUS FLOORING F. PREPARATION: Rem , , p Y
<br /> processes. place that are removable and are not to be painted. If removal is impractical or
<br /> e sure fire 3. At substrate expansion and isolation joints, provide joint in resinous :
<br /> E. FIRE PROTECTION: All practical measures shall be taken to n impossible because of size or weight of item, p[ovide surface-applied protection ` �:_
<br /> SUBMITTALS: Fumish sam les of the ro osed flooring system indicating oor'n to com I with resinous floorin manufacturer's written
<br /> 01 773 29-CUTTING AND PATCHING rotection durin all hases of the work. This shall include expediting construction A. : p P p fl i g p y 9
<br /> p g P and sealer. Provide before surface preparation and painting. Clean substrates of substances that
<br /> - ar cross hallwa fire sto at the division walls, and aggregate color, broadcast media texture color, gloss,finish recommendations.
<br /> of fire division walls, tempor y y p could impair bond of paints,including dust,dirt,oil,grease,and incompatible paints ,� �,
<br /> e rom unauthorized entr . No flammable li uids, (2) samples for each of(3) three options of broadcast media slip resistance, wet a, Apply joint sealant to comply with manufacturer's written
<br /> A. CONTRACTOR RESPONSIBILITY securing . th building f y 9
<br /> s r ed work indicated to i ent or com ressed ases shall be used, exce t under coefficient of friction: .65, .75; .85 per ANSI B101.1. Review and selection by recommendations, and encapsulants.
<br /> The Contractor shall bear all cost of correcting damaged or de t oy weldinglcutt ng equipm p 9 p : Owner rior to be innin the Work: A I rimer where re uired b resinous s stem, over prepared
<br /> remain on the Contract Documents, which is caused from failure to comply with the specific approval from the Owner. P 9 g b• pp y P Q � y y G. APPLICATION
<br /> requirements of the Contract. Documents or.failure to exercise reasonable care by.the
<br /> substrate at manufacturer's recommended spreading rate. 1. Paint all ex osed conduit, mechanical ductwork and fire sprinkler piping.
<br /> Contractor andlor the Subcontractors'work. F�
<br /> PROTECTION B. ACCEPTABLE MANUFACTURERS: Stonhard, Basis of Design. . c. Integral Cove Base: Stonshield cove mortar,apply cove base mix p
<br /> ' d s and other forms of rotection as re uired to to wall surfaces' before applying flooring. Apply according to 2• Do not paint fire sprinkler heads.
<br /> 1. Provide temporary barnca e p q 3. Do not paint over labels of independent testing agencies or equipment
<br /> C. PRODUCTS: Sfonhard, Inc.;Stonshield SLT. manufacturer's written instructions and details including those for name identification, erformance ra4in ,or nomenclature plates.
<br /> B. SUBMITTALS: Submit written request two (2) weeks in advance of.cutting or protect Owner's personnel and general public from injury due to selective � , P. 9
<br /> i n which affects: demolition. taping,mixing, Pr�n II orne seling, sanding, of cove base. Round ,
<br /> alterat o D. SYSTEM CHARACTERISTICS: internal and exter a !
<br /> n element of the Pro'ect 2. Provide rotective measures as required to ensure free and safe passage �• H. CLEANING AND PROTECTION .
<br /> 1. Structural integrity of a y ) P 1. Color and Pattern: Choose from Mfg. Standards 4. Apply primer where required by resinous system,over prepared substrate
<br /> - 'sture-resistant elements• of Owner's ersonnel and eneral ublic to and from occu ied portions of 1. A# end of each workday, remove rubbish, empty cans, rags, and other
<br /> 2. Integrity of weather exposed or moi P 9 P P 2. Wearing Surface: As approved by Owner. ` at manufacturer's recommended spreading rate.
<br /> i enance or safet of an o erational element; uildi
<br /> 3. Efficiency, ma nt y y p the b ng. 3. Inte ral Cove Base: 6 inches. 5. Broadcast: Immediately broadcast quartz silica aggregate into the discarded mate�ials from Project site.
<br /> g � 2. After completing paint application, clean. spattered surfaces. Remove
<br /> 4. Visual qualities of sight exposed e�ements;and 3. Protect from damage existing finish work that is to remain in place and 4. Overall S stem Thickness: nominal 2mm. undercoat usin manufacturer's specially designed spray caster. Strictly
<br /> e arate contractor. y 9 � '� covera e rates. spattered paints by washing, scraping, or other methods. Do not scratch
<br /> 5. Work of Owner or s p becomes exposed during demolition operations. p g
<br /> adhere to manufacturers installation rocedures and
<br /> ' e ularities b li htl abradin and or damage adjacent finished surfaces. � �= �
<br /> 4. Protect floors with suitable coverings when necessary. E. SYSTEM COMPONENTS: Manufacturer's standard components that are g. Undercoat: Remove any surface� irr g Y 9 Y 9 3. Protect work of other trades a ainst dama e from paint application. '
<br /> L ATCHING: When indicated to"match existin ,"submit products and/or
<br /> C. VISUA M 9 5. Construct temporary dust proof partitions to separate areas where noisy compatible with each other and as follows: vacuuming the floor surface. Mix and apply undercoat with strict g g �
<br /> finishes to match existin adjacent finishes for.Owner's review a'nd approval or,for 'ions with . adherence to manufacturer's insta,llation procedures and coverage rates.
<br /> Correct damage to work of other trades by cleaning, repairing, replacing, . �':�,
<br /> g r . or extensive dirt o�dust operations are performed. Equip partit 1. Primer
<br /> in new work use the s ecified materials and finishes in the Contract and refinishing, as approved by Owner, and leave in an undamaged
<br /> patch g , P dust roof doors and securit locks, if re uired. a. Material Basis:Stonhard Standard Primer 7. Broadcast: Immediately broadcast quartz silica aggregate into the
<br /> Documents. P Y q � condition. � .
<br /> 6. Remove rotections at completion of work and restore effected finishes. b. Resin: Epoxy undercoat using manufacturer's specially designed spray caster. Strict 4: At completion of construction activities of other trades, touch up and
<br /> ' P sed to ad'acent facilities b demolition work c. Formulation Description: (2)two component, 100 percent solids. adherence to manufactu�er's insfallation procedures and coverage rates restore dama ed or defaced ainted surfaces. •
<br /> D, PATCHING AND EXTENDWG WORK: Provide products.specified in the Contract 7• Promptlyrepair damages cau � y �
<br /> at no cost to Owner. d. Application Method: Squeegee and roller. is imperative. g P
<br /> Documents and/or match existing producfs with an alternate product of the most e. Number of Coats: (1)one. 8. Apply topcoat(s) in number of coats indicated for flooring system and at
<br /> suitable rade for the intended purpose. The Contracto�shall determine the type 2: Broadcast Media: spreading rates to match;Owner's approved sample. - ,
<br /> 9
<br /> and quality of existing products and finis.hes by inspection and/or testing, where I. UTILITY SERVICES: Maintain existing utilities indicated to remain, keep in ,
<br /> necessa . service,and protect against damage during demolition operations. Do not interrup# ` a. Material Basis:Stonshield quartz aggregate.
<br /> ry b. TYPe: pigmenfed. N. TERMINATIONS .
<br /> _ existing utilities serving occupied or used facilities, except when authorized in c. Finish: as approved Qwner. 1. Chase edges to °lock" 4he floori'ng system into the concrete substrate
<br /> � E. EXAMINATION; Prior to commencing work the Contractor shall inspect existing writing by authorities having jurisdiction and the Owner. Provide temporary d. Number of Coats: one. along lines of termination.
<br /> ascertain elements sub'ect to dama e or movement and to determine services durin interru tions to existin utilities; as acceptable to governing e: Pattern:Tweed. 2. Penetration T[eatment: La and seal resinous system onto the perimeter
<br /> condit'ions to J 9 , 9 P 9
<br /> the need for tem orar bracin durin cu.ttin and atchin work: Verif that � p ' .
<br /> : p y g g 9 P 9 Y authorities. 3. Undercoat: of the penetrating iterri,by bridging over compatible elastomer at the
<br /> materials to be worked-on or removed have been evaluate,d in the Owner's a: Material Basis: Stonshield undercoat. interface to compensate for possible movement. <<
<br /> Regulated Materials"Good Faith"Survey report. �. REMOVALS: Remove .debris, .rubbish and other materials resulting from b. Resin: Epoxy 3. Treat floor drains by chasing the(looring system to lock in place at point ,
<br /> , 1. . Beginning of cutting or.patching means acceptance of existing conditions. demolition o erations from building on a daily basis. Transport and legalty dispose c. Formulation:Two-component, 100°/a solids, UV Stable. _
<br /> 2. After cutting and/or removing existing work the Contracfor sha�l inspect . . p of termination.
<br /> of material off-site. d. Type: Clear. fi
<br /> conditions affecting performance of new work and notify Owner of any e. Finish: Gloss. O. JOINTS AND CRACKS `
<br /> unforeseen physical conditions and verify that demolition is complete and B ARD SYSTEMS f. Numberof Coats: one. 1. Treat control joints to bridge potential cracks and to maintain monolithic ,
<br /> : areas are ready for installation of new work. 09 20 00-GYPSUM O .
<br /> 4. Sealer: protection.
<br /> UALITY ASSURANCE a. Material Basis:Stonshield Sealer. 2. Treat cold joints and construction�joints to bridge potential cracks and to
<br /> A� Q b. Resin: Epoxy maintain monolithic protection on ihorizontal and vertical surfaces as well � ,�
<br /> F. PREPARATION 1. Perform work in accordance with GA 216-Standard Specifications for the o
<br /> ess to cuttin and atchin c. Formulation:(2)two-component, 100%solids, UV Stable. as horizontal and ver#icai interfaces:
<br /> 1. Move, or remove, items as necessary for acc g P 9 Application and Finishing of Gypsum Board, published by the Gypsum � i '
<br /> uir'd for erformance d. Type: Clear. 3. . Discontinue floor coating system at vertical and horizontal contraction and
<br /> work. Schedule shut-downs and obtain permits req e p Association.
<br /> e. Finish: Gloss. expansion joints by installing backer rod and compatible sealant after .
<br /> of the Work.
<br /> f. Number of Coats:one. coating installation is completed. Provide sealant type recommended by
<br /> 2. Provide temporary supports to ensure structural integrity of the Work. 2, Fire rating requirements take precedence over construction requirements" Texture level:As a roved b Owner. manufacturer for traffic conditions and chemical exposures to be
<br /> I indicated. fn event of conflict, notif Owner and do not roceed in area of g' ' PP Y
<br /> Y P encountered.
<br /> conflict until resolved. F. SYSTEM PHYSICAL PROPERTIES: Provide resinous flooring sysfem with the
<br /> following minimum physical property requirements when tested according to test P. FIELD QUALITY CONTROL: Owner may at any 4ime and any numbers of times , -
<br /> B. MANUFACTURERS: Sub'ect to compliance with requirements, provide ste�l methods indicated: during resinous flooring application require material samples for testing for ��
<br /> 1
<br /> framing,gypsum board and related products by one of the listed Manufacturers. 1. Compressive Strength: 9,000 psi after 7 days per ASTM C 579. . compliance with requirements.
<br /> �..
<br /> t�..
<br /> i '
<br /> i
<br /> : ��� W5741115 .. �:
<br /> a«h„e�f��e,��te�o�5 PHASE 2 RENOVATION PACKAGE
<br /> � �. . - � � � . � � ,� � � .- � - � � . . . . . . � . . - . . . � . , � . - . . - . . . _ � - . � _ . -_ . . � - � � . � � _ . � � � �szoro�rtna�e . . I . . .. . . . . . . - .. . � .� � . � . � � � � . - � - .. . � . . . � ..�� ��� . .- - .. , }.�'.
<br /> =��,e400 IFC SUBMITTAL
<br /> Y '
<br /> . . . . . . _ . - . . . . . . . . . . . .. . . . . . . . . . . . . . . . . �. . . . . SeOf�IG.WO . ' . . � . � . . . . � - . . . . . - ' . . . . . .. . . '
<br /> 98�0� 08.10.18 ,� .
<br /> . . . _ , . . . . . , . . . � ., . . . . . . , . . . . . 206 467 6306 � . � . . . . . . I''.
<br /> . . - - � � � . . . _ . . . . .. . . . . . � . . . . . . . . . . . . � . . . - � . � . , � � . . . . -buffabdesign.com � . � . . . . . . . � � . . . . . . . . . . . � . � � . . . � . ' � . � .
<br /> . . . , . . . . . . . . . - . � . . . . . - . . , , . . � .� . . . . , . . , . . . _ . . . - . . . . . �'��....
<br /> p� WN ATE SUBTITLE CURRENT REVISION SYMBOL D DATE .
<br /> ensioN sir a,�PRovEo o,a� ACCEPTABILITY W5741115 �I \�� 08.10.18
<br /> SYM REVISION BY APPROVED DATE SYM R : THIS DESIGN AND/OR CH K TEC H N I CAL S PEC I F I GATI O N S
<br /> W5741115 . BUFFALO 08.10.18 3s'3 RaacHiT cr SPECIFICATION IS APPROVED sHEEr .
<br /> ORIG RESTROOM RENOVATION � '
<br /> � APPRovEo BY DEPT. DATE EN � r�r� WORKPLACE ENVIRONMENT INVESTMENT �� G�
<br /> BOE/A/ .r ,
<br /> `" � CHECKED
<br /> ��,R�sEOW�o����N BUILDING 40-05, 40-024
<br /> srn�oFwnsHlNcroN APPROVED JOB NO. COMP N0.
<br /> W5741115
<br /> APPROV D RWG N0. '�;.
<br /> - �
<br /> ARCHITECTURAL MASTER EVERETf, WA G3
<br /> �
<br /> , ��:.
<br /> ,
<br /> �
<br />
|