My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/02/12 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/02/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:25:24 AM
Creation date
1/9/2020 11:23:46 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/12/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I J ,_ 1 � 8 <br /> EVERETT CITY COUNCIL AGENDA I1*M COVER SHEET <br /> PROJECT TITLE: <br /> Award the Design-Build Briefing COUNCIL BILL# <br /> Contract for Construction of Proposed Action Originating Department PW/Utilities <br /> Reservoir 6 Roof Replacement Consent Contact Person Richard Hefti <br /> to Shearer and Associates, Inc. Action Phone Number 425-257-7215 <br /> First Reading FOR AGENDA OF 2/12/2014 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department read 11. <br /> CAA F►' <br /> Council Preside <br /> Location Preceding Action Attachments Department(s)Approval <br /> W. Casino Rd. @ Approve DB Consultant Selection Summary PW,Legal <br /> 10th Ave. West PSA— 11/28/12 <br /> Call for RFQs—6/19/13 <br /> Amount Budgeted $5,300,000 FUND: 336 <br /> Expenditure Required $4,990,129 Account Number(s):UP 3500 <br /> Budget Remaining $95,577 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Reservoir 6 is located south of West Casino Road off 10th Ave West and consists of two covered 10 million <br /> gallon precast concrete potable water storage tanks. The project proposes replacing the existing 31-year old <br /> roof of each tank. Further degradation could affect water quality. <br /> The City received four Statements of Qualifications from qualified firms interested in performing this <br /> project. These firms were short-listed to three with proposals requested from them. Upon reviewing and <br /> scoring the three proposals, Shearer and Associates,Inc.received the highest score. The City has <br /> successfully completed Contract negotiations with Shearer and Associates, Inc.to include interior and <br /> exterior lighting upgrade, 5 year extended warranty and an additional cable tie for roof access safety. The <br /> final negotiated Design-Build Contract Price is $4,569,715,which is exclusive of sales tax. The sales tax <br /> that applies to this project amounts to an additional $420,414,bringing the total expenditure to $4,990,129. <br /> The project is scheduled to start September 2014 and be completed by June 2015. <br /> The "Budget Remaining" amount of$95,577 is arrived at by deducting the Contract amount,the sales tax, <br /> the Design-Build advisor consultant contract for$212,294, and the $2,000 advertising request from the <br /> $5,300,000 amount budgeted. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Award the Design-Build Contract for construction of Reservoir 6 Roof Replacement to Shearer and <br /> Associates, Inc. in the amount of$4,569,715.00,plus Washington State Sales Tax. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.