Laserfiche WebLink
- - .. . - ——`-�`��-i I. . . . .-- . <br /> RI:VISIONS RY <br /> CONSTRUCTION NOTES. FORM 2" WATER BASIN <br /> CONTRACTOR SHALL COMPLETELY FAMILIARIZE THEMSELVES WITH THE PROJECT AS WELL AS ALL UNDERGROUND - <br /> UTILITIES PRIOR TO CONSTRUCTION, DO NOT DISTURB ROOTS OF TREE TO REMAIN, CONSULT WITH PROJECT ARBORIST. TOP OF ROOT CROWN <br /> ALL BEDS TO BE WEED AND DEBRIS FREE PRIOR TO SOIL PREPARATION. ALL SHRUB BEDS TO BE 8" BELOW FINISHED BARK MULCH PER SPECIFICATIONS ri�;5 lau���<<ipe pl�u�is diagrammat�c,a�1 , <br /> KEEP MULCH 1-2" AWAY FROM STEM dimer�sions�re approximate and must he <br /> GRADE TO ALLOW FOR TOPSOIL AND MULCH. <br /> �I I II I � ���� OF PLANT r�i�i������r��. <br /> 1" WIDE SOFT RUBBER CHAIN LOCK TREE TIE � <br /> NOTIFY OWNER IF EXISTING SOIL CONDITIONS WILL PROVE DETRIMENTAL TO PLANT HEALTH, EVEN AFTER SOIL PREP, WRAP AROUND EACH STAKE AND TREE =I ( I I I I- EXISTING SOIL, DEEPLY SCARIFY AT SIDES OF QGHA Lnndscope Archftects 2016 <br /> SUCH AS EXCESSIVE CLAY SOIL, HARDPAN SOIL, POOR DRAINAGE, OR EXCESSIVE GRAVEL. —I I I � � — I I I= PLANT POCKET <br /> ���—��—� � �—���—���— _�� <br /> ADD 3.5" OF 50/50 CEDAR GROVE COMPOST SAND MIX TO PLANTING BEDS AND TILL INTO 6" OF EXISTING SOIL, ADD 2.5 —I I I—I I I—I I I—I I I—I I I— _ <br /> MORE INCHES OF COMPOST SAND MIX AND TILL INTO 6" OF SOIL. COMPACT TO 80% TO PREVENT SETTLING. �=I I I I I I=I I I=I I I=I I I—� BACKFILL WITH AMENDED NATIVE SOIL <br /> 2" DIA. WOOD STAKES, STAKE NEXT TO ROOTBALL <br /> AND FERTILIZER PER SPECIFICATIONS <br /> o _ LAYER OF MULCH PER SPECIFICATIONS SET AT 1/2" HIGHER THAN GROWN IN NURSERY <br /> PLANT TREES PER DETAIL#1 THIS SHEET. PLANT SHRUBS PER DETAIL#2. MULCH PLANTING BED WITH 2" OF MEDIUM FINE 'n � FORM 3" WATERING RING AROUND TREE, 2" OUTSIDE OF TREE STAKES PLANTING HOLE <br /> FIR BARK, KEEPING MULCH 2" FROM TRUNK OF TREE. FIRM BACKFILL IN PLACE AND WATER IN WELL Cz�4A �andscape Architects � <br /> TO BE 12" WIDER 1417 NE aotn st. <br /> EXISTING SOIL 1:1 SLOPE AT SIDES OF PLANT PIT SEATTLE> WA 98115 <br /> MULCH TO BE FREE OF GARBAGE AND WEEDS AND MAY NOT CONTAIN EXCESSIVE RESIN, TANNIN, OR OTHER MATERIAL ��� THAN ROOTBALL FOR SHRUBS AND 8" TELE 206.522.2334 FAX 206.526.5667 <br /> I 1=1 I I—I I I i I 1=1 I — <br /> DETRIMENTAL TO PLANT GROWTH. I II—I I I I I I-1I _ CUT BURLAP BACK FROM TOP 2/3 OF ROOTBALL WIDER THAN ROOTBALL FOR GROUNDCOVERS <br /> IIi—III =i,— ' DEPTH TO BE SAME AS ROOTBALL OR 12" <br /> GENTLY LOOSEN ROOTS OF CONTAINER STOCK THAT IS ROOTBOUND PRIOR TO PLANTING. FERTILIZE WITH BEST-PAKS II) � I _ I li,— WHICH EVER IS GREATER <br /> FERTILIZER, AVAIL. HORIZON 425.828.4554 ONE PACKET PER 1 GALLON, 2 PER 2 GAL, 3 PER 5 gal, 14 PER TREE. EVENLY BACKFILL PER PLANT NOTES <br /> SPACE PACKS AROUND ROOTBALL 6-8" FROM SOIL SURFACE. � SOIL BENEATH TREE TO BE EXISTING SOIL OR COMPACT SOIL S H RU B and G RO U N DCOVD E R P LANTI N G D ETAI L V <br /> ALL PLANTS SHALL CONFORM TO AMERICAN STANDARD FOR NURSERY STOCK, ANLA PROVIDE ONE YEAR WARRANTY `~ TO 85% MAX. DENSITY � SECTION N.T.S. z ; <br /> � <br /> STARTING FROM DATE OF FINAL ACCEPTANCE Z <br /> ___ TREE PIT TO BE THREE TIMES THE DIAMETER OF ROOTBALL � <br /> COORDINATE ALL WORK WITH GENERAL CONTRACTOR SET STAKES PARALLEL TO ADJACENT STREET � � <br /> 12" GREATER THAN ROOTBALL SET TREE 1" ABOVE GRADE AS GROWN IN NURSERY V <br /> PLANT GROUNDCOVERS A MINIMUM 18" FROM CONCRETE OR ASPHALT SURFACES � <br /> FIRM BACKFILL IN PLACE AND WATER IN WELL � <br /> IF TREE IS 4' OR CLOSER, HORIZONTALLY, FROM A PAVED SURFACES, INSTALL A 8' BY 24" SHEET OF PLASTIC ROOT TREE PLANTI NG DETAI L N.T.S. � ~ <br /> BARRIER BETWEEN TREE AND PIPE OR PAVED SURFACE. CENTER 8' SECTION ON TREE TRUNK, SET TOP OF BARRIER AT '� Z � <br /> TOP OF SOIL SURFACE, BELOW MULCH LEVEL. SET AGAINST ADJACENT PAVED SURFACE OR NEAR VICINITY OF UTILITY SECTION W <br /> PIPE. USE NDS SM-20 SHEETING OR SIMILAR PRODUCT, AVAILABLE FRANK J MARTIN COMPANY 206-523-7665. � �'"' <br /> U — � <br /> PROVIDE DESIGN BUILD IRRIGATION PLAN AND INSTALLATION FOR ALL PLANTED AREAS SHOWN ON THIS LANDSCAPE PLAN. � � <br /> Z � - <br /> F- 0 <br /> Z J � � <br /> w m M <br /> � � � <br /> � <br /> � � Q <br /> w � U <br /> � Critical Area Signs Per W W z <br /> � g�_p�� C i t y o f E v e r e tt S t a n d a r d s � - <br /> Chamfer Top of � N � : <br /> Post 45 Degrees � � <br /> MINIMUM OF 12" RELATIVELY FLAT AREA BEYOND PATH 6x6"Split Cedar Post To A Depth of 1" � <br /> � Q <br /> FINISHED GRADE 2x6"Split Cedar Rails ______.� On All Four Sides � r � <br /> 3:1 MAXIMUM SLOPE � <br /> � t <br /> 1' 4' PATH 1' ! <br /> 6 � i . vJ <br /> �`` ' �� Attach Pre-Printed <br /> MAXIMUM 2% CROSS SLOPE <br /> � F W <br /> Sign To Past� <br /> � � � �i With Two 5/8" <br /> o - v � D o a o. 3:1 MAXIMUM SLOPE r, Dia. Galvanized � <br /> v o o a a o od a � O <br /> o �� � Carriage Bolts <br /> m � ' _ . <br /> �� �� o� � , Pitch Surface to Drain � , <br /> 2 OF 3/8 MINUS CRUSHED ROCK WITH BINDER, COMPACT TO 95 0 � <br /> 4" OF 5/8" MINUS CRUSHED GRAVEL COMPACTED TO 95% ''' { Finish Elevation � z � � <br /> :t! � Q -� , . <br /> LANDSCAPE FABRIC = �� �•.'-�2 < 1 �` j f O � Q <br /> GRAVEL PATH � � <br /> �' '�' � Concrete Footing �� <br /> 4 ~ ~ <br /> � :�. ,� <br /> � ���--Backfill With Native Soil � � W <br /> NTS �� =„�.2::. i � <br /> SECTION 4�� � —M---Compacted Granular Sub-Base � 0 <br /> 0 <br /> �� � � z W <br /> � Q � � <br /> Post Connection J � Z Q <br /> CL w _ U <br /> W � � � . <br /> SPLIT-RAIL FENCE WITH CRITICAL AREA SIGNS J W Q z . <br /> — > � Q <br /> C!� W � � <br /> � <br /> � <br /> � �,n�na <br /> � a� <br /> � <br /> 0 <br /> � <br /> STATE OF <br /> WASHINGTON <br /> O LANDSCAPE ARCHITECT <br /> SPLIT RAIL FENCE WITH CRITICAL AREA SIGNS . �� � <br /> `�' � SIGNS TO BE SPACE A 48' ON CENTER MAX. COORDINATE WITH CITY OF EVERETT PLANNING NEIL BUCHANAN <br /> � . <br /> CERTIFICATE No. 513 <br /> O <br /> � <br /> I <br /> m <br /> � t.'t'l-{: ��f�-'_ <br /> � f'LFNNf�:G & C�;:��� . <br /> W DEV�.LdPi�9EN�r <br /> Y <br /> Q �Y <br /> � `�r�TE _\C` 2� Z� � <br /> , --�. <br /> W <br /> � <br /> J . <br /> H <br /> % DATE: 9-19-2017 <br /> � <br /> � SCALE: ON PLAN � <br /> J <br /> � DRAWN BY: NB <br /> � <br /> ' JOB: <br /> � <br /> J SHEET: <br /> Q <br /> � <br /> � <br /> � <br /> w <br /> � <br /> � <br /> 0 <br /> U ` <br /> / <br /> � <br /> � � <br /> 3 ' <br /> Q <br /> � <br /> 3 of 3 SHEETS � <br /> Q <br /> � <br />