Laserfiche WebLink
Date_,�r/ <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />zip <br />Applicant <br />Describe Proposed Work <br />Project Address (if known) <br />Attach four (4) copies of plans lot proposed work - Draw to scald and note the following as aliplicable <br />Public Weds Permit S <br />Bldg. Dept. s <br />Public Mike Fee $ <br />Total Fee <br />Less Appt Fee Paid $ <br />Balance Due <br />• Property Lines <br />• Centerline of street <br />• Outline and dimensions of all existing and <br />• Indicate North <br />proposed structures on the lot <br />• Show any proposed grading changes <br />• Existing and proposed utilities <br />• Show meae.urements <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hr& in advance - phone 259.881 5. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800.424.5555. <br />IAIE7 �F2m.i Alv7- lf'�CPCUr eE,12 <br />Approved for Construction Date <br />FINAL INSPECTION <br />Approved as Constructed <br />J <br />ev�/ PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everitt, WA 98201 <br />Phone. 259-8815 <br />/z_ V- F,4 <br />lf_�z <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />ttttttttt� <br />O <br />z <br />0 <br />0 <br />a <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvoment or other right-of-way use hereto <br />applied for and further agrees tc remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Date <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND 1HEREAFTER IS TO <br />3E DILIGENTLY PURSUED TO COMPLETION, THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPGN ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />