Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 11/19/2019 14:58 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 10/14/2019 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 19 3 <br /> Title CONVERT.75 2228 ADAMS AVE UT3473-19-3 <br /> Work Order No 20192540 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 10/14/2019 Time 15:30 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS0885D099 WASRVC YES 10/14/2019 <br /> Address 2228 ADAMS AVE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 2228 ADAMS AVE <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 3 48.507 10/15/2019 PAP <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 75.458 10/15/2019 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 209.495 10/15/2019 PAP <br /> M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 3 1.029 10/15/2019 PAP <br /> M SETT34146547 SETTER COPPER 5/8 X 3/4 HEIGHT 9"NO LEG LENGTH HI/HO 1 119.901 10/15/2019 PAP <br /> Total.Material Cost $454.40 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK .25 6.405 10/15/2019 <br /> NA N/A TOPSOIL .13 3.851 10/15/2019 <br /> Total NA Cost $10.26 <br />