My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3530 COLBY AVE COCOON HOUSE Geotech Report 2022-10-25
>
Address Records
>
COLBY AVE
>
3530
>
COCOON HOUSE
>
Geotech Report
>
3530 COLBY AVE COCOON HOUSE Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:07:58 PM
Creation date
1/13/2020 8:45:01 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3530
Tenant Name
COCOON HOUSE
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cocoon House JN 16422 <br /> November 3, 2016 Page 8 <br /> recommendations or specifications related to waterproofing design, or minimizing the <br /> potential for infestations of mold and mildew are desired. <br /> The General, Slabs-On-Grade, and Drainage Considerations sections should be <br /> reviewed for additional recommendations related to the control of groundwater and excess <br /> water vapor for the anticipated construction. <br /> SLABS-ON-GRADE <br /> The building floors can be constructed as slabs-on-grade atop competent native soil, or on <br /> structural fill. The subgrade soil must be in a firm, non-yielding condition at the time of slab <br /> construction or underslab fill placement. Any soft areas encountered should be excavated and <br /> replaced with select, imported structural fill. <br /> Even where the exposed soils appear dry, water vapor will tend to naturally migrate upward through <br /> the soil to the new constructed space above it. This can affect moisture-sensitive flooring, cause <br /> imperfections or damage to the slab, or simply allow excessive water vapor into the space above <br /> the slab. All interior slabs-on-grade should be underlain by a capillary break drainage layer <br /> consisting of a minimum 4-inch thickness of clean gravel or crushed rock that has a fines content <br /> (percent passing the No. 200 sieve) of less than 3 percent and a sand content (percent passing the <br /> No. 4 sieve) of no more than 10 percent. Pea gravel or crushed rock are typically used for this <br /> layer. <br /> As noted by the American Concrete Institute (ACI) in the Guides for Concrete Floor and Slab <br /> Structures, proper moisture protection is desirable immediately below any on-grade slab that will be <br /> covered by tile, wood, carpet, impermeable floor coverings, or any moisture-sensitive equipment or <br /> products. ACI also notes that vapor retarders such as 6-mil plastic sheeting have been used in the <br /> past, but are now recommending a minimum 10-mil thickness for better durability and long term <br /> performance. A vapor retarder is defined as a material with a permeance of less than 0.3 perms, <br /> as determined by ASTM E 96. It is possible that concrete admixtures may meet this specification, <br /> although the manufacturers of the admixtures should be consulted. Where vapor retarders are <br /> used under slabs, their edges should overlap by at least 6 inches and be sealed with adhesive. <br /> tape. The sheeting should extend to the foundation walls for maximum vapor protection. If no <br /> potential for vapor passage through the slab is desired, a vapor barrier should be used. A vapor <br /> barrier, as defined by ACI, is a product with a water transmission rate of 0.01 perms when tested in <br /> accordance with ASTM E 96. Reinforced membranes having sealed overlaps can meet this <br /> requirement. <br /> The General, Permanent Foundation and Retaining Walls, and Drainage Considerations <br /> sections should be reviewed for additional recommendations related to the control of groundwater <br /> and excess water vapor for the anticipated construction. <br /> EXCAVATIONS AND SLOPES <br /> Excavation slopes should not exceed the limits specified in local, state, and national government <br /> safety regulations. Temporary cuts to a depth of about 4 feet may be attempted vertically in <br /> unsaturated soil, if there are no indications of slope instability. However, vertical cuts should not be <br /> made near property boundaries, or existing utilities and structures. Based upon Washington <br /> Administrative Code (WAC) 296, Part N, the upper loose fill soil at the subject site would generally <br /> GEOTECH CONSULTANTS,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.