Laserfiche WebLink
a ..F , �__ .._. .- <br /> .�;o°° ;.a.,�`,p "a.c', • �,po•,•70'e -•�•. °.p;.Q.'o'.p <br /> �'°, 00000 00 ;1 °02.° °G °Uo °Oo '0-o °p0 000 opo oDo <br /> Unsuitable �q o.o �o o,°o:.�. o•w; :,_,-°° o °a',�o oo°o• ... _ Structural Fill (refer to report for <br /> Soils 0°b'' 0 ° -' °'�•`' ' 0=r° .0 ° gradation and compaction requirements). <br /> t c ' o•° v ° .o o ° .p o -c V o , . o o .° p . o <br /> "°°° °o ,p0 00 000 00• a� °°� oo °;,6°0.c. °oo. _p, See Note 2 for condition where lean <br /> °:oo ° ° a:oC o o°°:o, o , N' s-,-•,, ;o0 0•o : in'o , <br /> ',4 g,o,°o.o oo°...,'; d•oo„� > °a•oOo °o; 0 0, q ° concrete is used to backfill the <br /> 0; .p.., ,, . .. 0 o o_'o., 0.0 <br /> r , °.o o_°°e°., ,..°0.0�o.o . o° overexcavation. <br /> o° �°oWidth of Overexcavation o�•o °•a°° <br /> .••;,;,.,0,0 °� 0 0'0 .. o o p°O o' <br /> -Alill= ,I11,=-111 -411M-111 =1111=13=ill=1111=1111 lul=lli illli 11111111-1 =111iO1"r- <br /> -ili,=IIIIIIIIIIIi=III:=IIII=II.I1=IIiIIIIL IIJ___,IIII lli lllli,llll�llfl—Illi- <br /> (. ' <br /> Suitable Bearing Soil (Refer to report for description) <br /> verify by Geotechnical Engineer prior to placing Structural <br /> Fill. <br /> Width of Overexcavation = Footing Width (FW) + Depth of Overexcavation <br /> NOTES: <br /> 1. Refer to report text for additional overexcavation, foundation, and structural fill considerations. <br /> 2. Where lean concrete (minimum 1-1/2 sacks of cement per cubic yard) is used to backfill the <br /> overexcavation, the overexcavation must extend only 6 inches beyond the edges of the footing. <br /> TYPICAL FOOTING OVEREXCAVATION <br /> i GEOTECH 3530 Colby Avenue <br /> CONSULTANTS,INC. Everett, Washington <br /> i <br /> - Job No: Date: Plate: <br /> 16422 Nov.2016 7 <br />