Laserfiche WebLink
Envelope Summary ENV-SUM <br /> Project Info Project Title: Cocoon House Youth Center Date 12/07/2017 <br /> Applicant Info. Company Name: GGLO Design For Building Department Use <br /> Provide contact Company Address: 1301 First Avenue,Suite 301,Seattle,WA98101 <br /> information for <br /> individual who can Applicant Name: Scott Schreffler <br /> retospondinquiries <br /> about information Applicant Phone: 206.902.5560 <br /> provided. Applicant Email: Sschreffler@GGLO.com <br /> Project Description ❑✓ New Building ❑ Addition ❑ Alteration ❑ No Envelope Scope <br /> Envelope Project Scope ❑ All Commercial E Group R-Commercial ❑ Mixed Use-Commercial+Group R <br /> Select all that apply. <br /> ❑ Semi-heated ❑ Refrigerated Cooler ❑ Refrigerated Freezer ❑ Equipment Building <br /> Envelope Description The building is 35,000 square feet on 3 floors.The mixed-use development will include <br /> Provide brief description of the project and approximately 40 housing units for homeless youth,a day/drop-in center and office space <br /> relevant supporting documentation. for staff. <br /> If project includes multiple Target Insulation All residents will have access to wrap-around services in a safe living environment. <br /> Allowance areas,and/or is demonstrating <br /> compliance as an Addition+Existing, No parking in the buidling. <br /> Alteration+Existing,or <br /> Addition+Alteration +Existing project, <br /> provide a brief summary of the approach to <br /> Air Barrier Testing ❑✓ Air barrier testing per Section C402.5.1.2 included in project scope <br /> Air barrier testing is required for all new <br /> construction projects. Testing criteria is 0.40 ❑Q Additional Efficiency Package Option-C406.9 Reduced Air Infiltration <br /> cfm/ft2 under test pressure of 0.3 inch w.g. <br /> To comply with C406.9, demonstrate that ❑ Testing not required. Explanation: <br /> measured air leakage of building envelope <br /> ; <br /> Compliance Documentation Scope and Method <br /> Scope of This Calculation 0 New Building LI Addition ❑ Alteration ❑ No Envelope Scope <br /> Target Insulation Allowance ® Fully Conditioned-Commercial,Group R,Mixed Use <br /> Sets the title and calculations in the <br /> compliance forms.Selection required 0 Semi-heated 0 Refrigerated Cooler 0 Refrigerated Freezer <br /> to enable forms. If project includes more than one Target Insulation Allowance area,and/or if project includes <br /> addition and alteration areas complying independently, for each area complete an ENV-SUM form <br /> Rows 16-46 and either an ENV-PRESCRIPTIVE form,or ENV-UA+ENV-SHGC forms if <br /> demonstrating compliance via component performance. <br /> Envelope Compliance Path Prescriptive ® Component Performance <br /> Selection required to enable forms. <br /> Component Performance ❑ Change of Occupancy(C503.2)/Conditioning(C505)- 10%higher UA allowed <br /> Calculation Adjustments ❑ Additional Efficiency Package Option-C406.8 Enhanced Envelope-15%lower UA required <br /> Additions 0 Addition stand alone 0 Addition+Existing <br /> Addition stand alone-Complete Vertical Fenestration and Skylight Area Calculation.Enter total existing-to-remain wall,roof, vertical <br /> fenestration and skylight areas as EXISTING.Enter total addition envelope assembly areas as NEW.If resulting total building WWR exceeds <br /> 30%and/or SSR exceeds 5%,refer to C502.2.1 and C502.2.2 for prescriptive compliance alternatives. If complying via component performance, <br /> complete ENV-UA per instructions for addition stand alone projects. <br /> Addition+existing-Complete ENV-UA per instructions for addtion+existing projects. <br /> Alterations- ❑ Replacement windows only,or resulting ❑ Total building WWR increased by alteration <br /> total building WWR<_original WWR <br /> Fenestration and Skylight <br /> ❑ Replacement skylights only,or resulting El Total building SRR increased by alteration <br /> total building SRR<_original SRR <br /> WWR and SRR not increased-Vertical Fenestration and Skylight Area Calculation not required. <br /> WWR and/or SRR increased-Complete Vertical Fenestration and Skylight Area Calculation. Enter total existing-to-remain wall,roof, vertical <br /> fenestration and skylight areas as EXISTING.Enter total altered envelope assembly areas as NEW.If resulting total building WWR exceeds 30% <br /> and/or SSR exceeds 5%,refer to C503.3.2 and C503.3.3 for prescriptive compliance alternatives. If complying via component performance, <br /> complete ENV-UA per instructions for alteration+existing projects. <br />