My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3530 COLBY AVE COCOON HOUSE 2020-01-13
>
Address Records
>
COLBY AVE
>
3530
>
COCOON HOUSE
>
3530 COLBY AVE COCOON HOUSE 2020-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 10:43:19 AM
Creation date
1/13/2020 10:37:42 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3530
Tenant Name
COCOON HOUSE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Envelope Summary ENV-SUM <br /> Project Info Project Title: Cocoon House Youth Center Date 12/07/2017 <br /> Applicant Info. Company Name: GGLO Design For Building Department Use <br /> Provide contact Company Address: 1301 First Avenue,Suite 301,Seattle,WA98101 <br /> information for <br /> individual who can Applicant Name: Scott Schreffler <br /> retospondinquiries <br /> about information Applicant Phone: 206.902.5560 <br /> provided. Applicant Email: Sschreffler@GGLO.com <br /> Project Description ❑✓ New Building ❑ Addition ❑ Alteration ❑ No Envelope Scope <br /> Envelope Project Scope ❑ All Commercial E Group R-Commercial ❑ Mixed Use-Commercial+Group R <br /> Select all that apply. <br /> ❑ Semi-heated ❑ Refrigerated Cooler ❑ Refrigerated Freezer ❑ Equipment Building <br /> Envelope Description The building is 35,000 square feet on 3 floors.The mixed-use development will include <br /> Provide brief description of the project and approximately 40 housing units for homeless youth,a day/drop-in center and office space <br /> relevant supporting documentation. for staff. <br /> If project includes multiple Target Insulation All residents will have access to wrap-around services in a safe living environment. <br /> Allowance areas,and/or is demonstrating <br /> compliance as an Addition+Existing, No parking in the buidling. <br /> Alteration+Existing,or <br /> Addition+Alteration +Existing project, <br /> provide a brief summary of the approach to <br /> Air Barrier Testing ❑✓ Air barrier testing per Section C402.5.1.2 included in project scope <br /> Air barrier testing is required for all new <br /> construction projects. Testing criteria is 0.40 ❑Q Additional Efficiency Package Option-C406.9 Reduced Air Infiltration <br /> cfm/ft2 under test pressure of 0.3 inch w.g. <br /> To comply with C406.9, demonstrate that ❑ Testing not required. Explanation: <br /> measured air leakage of building envelope <br /> ; <br /> Compliance Documentation Scope and Method <br /> Scope of This Calculation 0 New Building LI Addition ❑ Alteration ❑ No Envelope Scope <br /> Target Insulation Allowance ® Fully Conditioned-Commercial,Group R,Mixed Use <br /> Sets the title and calculations in the <br /> compliance forms.Selection required 0 Semi-heated 0 Refrigerated Cooler 0 Refrigerated Freezer <br /> to enable forms. If project includes more than one Target Insulation Allowance area,and/or if project includes <br /> addition and alteration areas complying independently, for each area complete an ENV-SUM form <br /> Rows 16-46 and either an ENV-PRESCRIPTIVE form,or ENV-UA+ENV-SHGC forms if <br /> demonstrating compliance via component performance. <br /> Envelope Compliance Path Prescriptive ® Component Performance <br /> Selection required to enable forms. <br /> Component Performance ❑ Change of Occupancy(C503.2)/Conditioning(C505)- 10%higher UA allowed <br /> Calculation Adjustments ❑ Additional Efficiency Package Option-C406.8 Enhanced Envelope-15%lower UA required <br /> Additions 0 Addition stand alone 0 Addition+Existing <br /> Addition stand alone-Complete Vertical Fenestration and Skylight Area Calculation.Enter total existing-to-remain wall,roof, vertical <br /> fenestration and skylight areas as EXISTING.Enter total addition envelope assembly areas as NEW.If resulting total building WWR exceeds <br /> 30%and/or SSR exceeds 5%,refer to C502.2.1 and C502.2.2 for prescriptive compliance alternatives. If complying via component performance, <br /> complete ENV-UA per instructions for addition stand alone projects. <br /> Addition+existing-Complete ENV-UA per instructions for addtion+existing projects. <br /> Alterations- ❑ Replacement windows only,or resulting ❑ Total building WWR increased by alteration <br /> total building WWR<_original WWR <br /> Fenestration and Skylight <br /> ❑ Replacement skylights only,or resulting El Total building SRR increased by alteration <br /> total building SRR<_original SRR <br /> WWR and SRR not increased-Vertical Fenestration and Skylight Area Calculation not required. <br /> WWR and/or SRR increased-Complete Vertical Fenestration and Skylight Area Calculation. Enter total existing-to-remain wall,roof, vertical <br /> fenestration and skylight areas as EXISTING.Enter total altered envelope assembly areas as NEW.If resulting total building WWR exceeds 30% <br /> and/or SSR exceeds 5%,refer to C503.3.2 and C503.3.3 for prescriptive compliance alternatives. If complying via component performance, <br /> complete ENV-UA per instructions for alteration+existing projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.