My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2018 BLDG 40-03 Plans 2022-11-10
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-03
>
Plans
>
3003 W CASINO RD 2018 BLDG 40-03 Plans 2022-11-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 11:28:29 AM
Creation date
1/13/2020 11:28:44 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-03
Permit
B1811-030
Year
2018
Notes
ACCESS SELECTIVE DEMO CMU WALLS ADN BUILD BACK PLUMBING WALLS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISSUE LEGEND . <br /> NOT YET ISSUED <br /> �:� <br /> INCLUDED <br /> IN SET O PREVIOUSLY ISSUED, �:� �, <br /> SHEET N0. SEQ. N0. DRAWING TITLE REV DATE NOT IN THIS ISSUE <br /> GENERA� , - � <br /> • GO GO COVER SHEET, CODE INFORMATION A 11 .13.18 <br /> • G1 G1 INDEX OF DRAWINGS A 11 .13.18 � <br /> • G2 G2 SYMBOLS, ABBREVIATIONS, GENERAL NOTES A 11 .13.18 ORIG ORIGINA� ISSUE <br /> • G3 G3 TECHNICAL SPECIFICATIONS A 11 ,13.18 FOR PERMIT, BID, <br /> � PROCUREMENT OR <br /> �� <br /> A R C H TE C TU R A � CONSTRUCTION ; <br /> ,4 . <br /> • 40-003-1A18R A1 PARTIAL FIRST FLOOR REMOVAL PLAN A 11 .13.18 , <br /> • 40-003-1A17 A2 PARTIAL FIRST FLOOR PLAN F 11 .13.18 A DRAWING REVISION - , <br /> • 40-003-1A18 A3 PARTIAL FIRST FLOOR PLAN C 11 .13.18 SEE SPECIFIC DRAWING - <br /> FOR NATURE OF <br /> • 40-003-A375 A4 INTERIOR ELEVATIONS A 11 .13.18 REVISION <br /> • 40-003-A452 A5 ENLARGED FIRST FLOOR PLAN A 11 .13.18 � <br /> • 40-003-A501 A6 DETAILS A 11 .13.18 <br /> • 40-003-A502 A7 SECTIONS AND DETAILS A 11 .13.18 <br /> �� <br /> • 40-003-A503 A8 SECTIONS AND DETAILS A 11 .13.18 <br /> ,:4 � <br /> , M ECH AN CA� <br /> .� <br /> • 40-SITE-M 1 A M 1 HVAC LEGEND A 10.08,18 <br /> • 40-SITE-M1 B M2 PIPING LEGEND ORIG 10.08.18 � - <br /> • 40-SITE-M2 M3 MECHANICAL SPECIFICATIONS ORIG 10.08.18 . <br /> • 40-SITE-M2-1 M4 MECHANICAL SCHEDULES AND DETAILS ORIG 10.08.18 • <br /> • 40-003-1 M117R M5 PLUMBING PIPING PLAN - REMOVAL A 10.08.18 <br /> • 40-003-1 M118R M6 PLUMBING PLAN - REMOVAL C 10.08.18 <br /> • 40-003-1 M17 M7 HVAC DUCTWORK PLAN - FIRST FLOOR B 10.08.18 � <br /> • 40-003-1 M18 M8 DUCTWORK PLAN B 10.08.18 <br /> • 40-003-1 M117 M9 PLUMBING PIPING PLAN A 10.08.18 <br /> � <br /> • 40-003-1 M118 M10 PLUMBING PLAN C 10,08.18 <br /> • 140-003-4001 M7 TOILET ROOM PLANS AND DIAGRAMS (REFERENCE ONLY • - <br /> • 140-003-4001 M8 TOILET ROOM PLANS AND DIAGRAMS (REFERENCE ONLY . <br /> E�ECTR CA � <br /> 40-003-EO E1 ELECTRICAL LEGEND B 10.08.18 � <br /> � 40-003-E4A E2 SUBSTATION 1 -4 V03-2 ONE-LINE DIAGRAM F 10.08.18 <br /> • 40-003-E4B E3 SUBSTATION 1 -5 V03-3 ONE-LINE DIAGRAM G 10.08.18 <br /> �:� <br /> • 40-003-1 E17 E4 LIGHTING PLAN - FIRST FLOOR B 10.08.18 <br /> • 40-003-1 E18 E5 LIGHTING PLAN - FIRST FLOOR D 10.08.18 • • <br /> • 40-003-1 E67 E6 208Y 120V POWER PLAN - FIRST FLOOR M 10.08.18 : <br /> • 40-003-1 E68 E7 208Y 120V POWER PLAN H 10.08.18 • <br /> • 40-003-E503 E8 LIGHTING FIXTURE SCHEDULE AND DETAILS C 10.08.18 <br /> • 40-003-E547 E9 FLUSH VALVE AND FAUCET POWER DETAILS ORIG 10.08.18 <br /> �. <br /> � . <br /> t. <br /> ,,� . <br /> A . . <br /> W5741115 � <br /> PHASE 3 RENOVATION PACKAGE ' <br /> buffolodealgn IFC SUBMITTAL - REVISION 1 <br /> architecture � interiors ��.�3.�H <br /> 1520 fourth ave <br /> suite 400 <br /> seattle,wa <br /> 98)O l <br /> 206 467 6306 <br /> � <br /> buffalodesign.com a. �. <br /> �- <br /> �; <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE � �. , <br /> 3g,3 REGISTERED THIS DESIGN AND/OR CHECKED INDEX OF DRAWINGS W5741115 A 11 .13.18 � <br /> ORIG WORKPLACE ENVIRONMENT INVESTMENT W5741115 BUFFALO 10.08.18 ARCHITECT SPECIFICATION IS APPROVED SHEET o <br /> A RESTROOM RENOVATION REV1 W5741115 BUFFALO 11.13.18 BOE,�� � APPROVED BY DEPT. DATE GINEE TITLE WORKPLACE ENVIRONMENT INVESTMENT � . <br /> C���� CHECKED <br /> G1 G1 � <br /> cH�is EowaR�caR�soN APPROVED B U I L D I N G 40�00� JOB N0. COMP N0. z <br /> STATE OF WASHINGTON W5741 115 v <br /> APPROVED ARCHITECTURAL MASTER COL. N/A EVERE�f, Wq °wc r,o. G1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.