Laserfiche WebLink
ISSUE LEGEND . <br /> NOT YET ISSUED <br /> �:� <br /> INCLUDED <br /> IN SET O PREVIOUSLY ISSUED, �:� �, <br /> SHEET N0. SEQ. N0. DRAWING TITLE REV DATE NOT IN THIS ISSUE <br /> GENERA� , - � <br /> • GO GO COVER SHEET, CODE INFORMATION A 11 .13.18 <br /> • G1 G1 INDEX OF DRAWINGS A 11 .13.18 � <br /> • G2 G2 SYMBOLS, ABBREVIATIONS, GENERAL NOTES A 11 .13.18 ORIG ORIGINA� ISSUE <br /> • G3 G3 TECHNICAL SPECIFICATIONS A 11 ,13.18 FOR PERMIT, BID, <br /> � PROCUREMENT OR <br /> �� <br /> A R C H TE C TU R A � CONSTRUCTION ; <br /> ,4 . <br /> • 40-003-1A18R A1 PARTIAL FIRST FLOOR REMOVAL PLAN A 11 .13.18 , <br /> • 40-003-1A17 A2 PARTIAL FIRST FLOOR PLAN F 11 .13.18 A DRAWING REVISION - , <br /> • 40-003-1A18 A3 PARTIAL FIRST FLOOR PLAN C 11 .13.18 SEE SPECIFIC DRAWING - <br /> FOR NATURE OF <br /> • 40-003-A375 A4 INTERIOR ELEVATIONS A 11 .13.18 REVISION <br /> • 40-003-A452 A5 ENLARGED FIRST FLOOR PLAN A 11 .13.18 � <br /> • 40-003-A501 A6 DETAILS A 11 .13.18 <br /> • 40-003-A502 A7 SECTIONS AND DETAILS A 11 .13.18 <br /> �� <br /> • 40-003-A503 A8 SECTIONS AND DETAILS A 11 .13.18 <br /> ,:4 � <br /> , M ECH AN CA� <br /> .� <br /> • 40-SITE-M 1 A M 1 HVAC LEGEND A 10.08,18 <br /> • 40-SITE-M1 B M2 PIPING LEGEND ORIG 10.08.18 � - <br /> • 40-SITE-M2 M3 MECHANICAL SPECIFICATIONS ORIG 10.08.18 . <br /> • 40-SITE-M2-1 M4 MECHANICAL SCHEDULES AND DETAILS ORIG 10.08.18 • <br /> • 40-003-1 M117R M5 PLUMBING PIPING PLAN - REMOVAL A 10.08.18 <br /> • 40-003-1 M118R M6 PLUMBING PLAN - REMOVAL C 10.08.18 <br /> • 40-003-1 M17 M7 HVAC DUCTWORK PLAN - FIRST FLOOR B 10.08.18 � <br /> • 40-003-1 M18 M8 DUCTWORK PLAN B 10.08.18 <br /> • 40-003-1 M117 M9 PLUMBING PIPING PLAN A 10.08.18 <br /> � <br /> • 40-003-1 M118 M10 PLUMBING PLAN C 10,08.18 <br /> • 140-003-4001 M7 TOILET ROOM PLANS AND DIAGRAMS (REFERENCE ONLY • - <br /> • 140-003-4001 M8 TOILET ROOM PLANS AND DIAGRAMS (REFERENCE ONLY . <br /> E�ECTR CA � <br /> 40-003-EO E1 ELECTRICAL LEGEND B 10.08.18 � <br /> � 40-003-E4A E2 SUBSTATION 1 -4 V03-2 ONE-LINE DIAGRAM F 10.08.18 <br /> • 40-003-E4B E3 SUBSTATION 1 -5 V03-3 ONE-LINE DIAGRAM G 10.08.18 <br /> �:� <br /> • 40-003-1 E17 E4 LIGHTING PLAN - FIRST FLOOR B 10.08.18 <br /> • 40-003-1 E18 E5 LIGHTING PLAN - FIRST FLOOR D 10.08.18 • • <br /> • 40-003-1 E67 E6 208Y 120V POWER PLAN - FIRST FLOOR M 10.08.18 : <br /> • 40-003-1 E68 E7 208Y 120V POWER PLAN H 10.08.18 • <br /> • 40-003-E503 E8 LIGHTING FIXTURE SCHEDULE AND DETAILS C 10.08.18 <br /> • 40-003-E547 E9 FLUSH VALVE AND FAUCET POWER DETAILS ORIG 10.08.18 <br /> �. <br /> � . <br /> t. <br /> ,,� . <br /> A . . <br /> W5741115 � <br /> PHASE 3 RENOVATION PACKAGE ' <br /> buffolodealgn IFC SUBMITTAL - REVISION 1 <br /> architecture � interiors ��.�3.�H <br /> 1520 fourth ave <br /> suite 400 <br /> seattle,wa <br /> 98)O l <br /> 206 467 6306 <br /> � <br /> buffalodesign.com a. �. <br /> �- <br /> �; <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE � �. , <br /> 3g,3 REGISTERED THIS DESIGN AND/OR CHECKED INDEX OF DRAWINGS W5741115 A 11 .13.18 � <br /> ORIG WORKPLACE ENVIRONMENT INVESTMENT W5741115 BUFFALO 10.08.18 ARCHITECT SPECIFICATION IS APPROVED SHEET o <br /> A RESTROOM RENOVATION REV1 W5741115 BUFFALO 11.13.18 BOE,�� � APPROVED BY DEPT. DATE GINEE TITLE WORKPLACE ENVIRONMENT INVESTMENT � . <br /> C���� CHECKED <br /> G1 G1 � <br /> cH�is EowaR�caR�soN APPROVED B U I L D I N G 40�00� JOB N0. COMP N0. z <br /> STATE OF WASHINGTON W5741 115 v <br /> APPROVED ARCHITECTURAL MASTER COL. N/A EVERE�f, Wq °wc r,o. G1 <br />