Laserfiche WebLink
4' <br /> .{ <br /> (2)4"C, EACH W/3 SINGLE CONDUCTOR � I <br /> 350 MCM, 15KV SHIE�DED CABLES & (1 ) EG E I �I D . <br /> 4/0 BARE CU GND. CONDUCTOR 12.47KV FEEDER FROM � <br /> 4/0 BARE EXISTING 1000KVA UNIT SEE SHEET EO FOR SYMBOLS AND LEGEND. <br /> cu cR�. CONDUCTOR SUBSTATION IN BLDG 40-01 <br /> TO BLDG. GROUND Y�—"�- � FDR-1 -1 TYPE RATING CONDUIT CONDUCTORS PER CONDUIT <br /> TO SUBSTATION �1 -3 TO SUBSTATION �1 -5 QTY SIZE PHASE NEUTRAL GROUND I.G. <br /> �: <br /> VAULT (V03-1) 15KV SPLICE 80X � _ _ _ i VAULT (V03-3) E5 600A 2 3 1/2" 3–�350kcmil �350kcmil � -4:' � <br /> SEE DWG. 40-03–E4 SEE DWG. 40-03–E4b – – <br /> (#00005316) FDR-2-1 (#00005318) � <br /> _ _ _ E� 600A 2 3" 3–#300kcmil �300kcmil – – � <br /> 15KV-3 C-350 MCM SHIELDED FDR2-1 FDR1 -1 � <br /> INTERLOCKED ARMOR CABLE 1 -3-2 1 -3-1 E8 600A 2 3 1/2" 3–#350kcmil – – – <br /> 15KV H5 400A 1 3" 3–�500kcrnil – – – . <br /> j INTERRUPTER � <br /> SWITCHES M1 225A 1 2" 3–�4/0 – <br /> � <br /> M2 225A 1 2" 3–�4/0 �4/0 – – " <br /> 80E ' ' <br /> � I M8 225A 1 3" 3–�4/0 �4/0 � <br /> I � � – – . <br /> 12.47KV M9 225A 1 2 1/2" 3–�4/0 �4/0 �4 <br /> — p <br /> _ �� 1000/1333KVA S U B STAT 0 f� � 1 - 4 M11 225A 1 3" 3– 4 0 – – – � � <br /> - - - - - - - - - O � � <br /> 480Y/277V , �A U �T (�0 � - 2 ) » <br /> P� 175A 1 2 3–�2/0 �2/0 <br /> � POWER �B � SPACES: NONE , <br /> < <br /> � MONITOR P8 175A 1 2 1/2" 3–�2/0 �2/0 " �:f <br /> A AS • . <br /> COOLING FAN -�---� R1 225A 1 1 1/2" 3–�1 – – – � <br /> I <br /> �0---- VS T —� I R7 125A 1 2" 3–#1 – – <br /> I � <br /> � 1600AF � 100A _ _ _ � <br /> 1600AT ) T1 1 1 1/2" 3–�2 . <br /> 1200A, 480/277V, 3�, 4W <br /> � I T8 100A � � " 3–#2 – – – <br /> I �� <br /> I A6 A5 A4 A3 A2 A1 U1 80A 1 1 1/2" 3–�4 – – – " �� <br /> � TI E ' � <br /> � � � � � � � I , <br /> 600AF 600AF 600AF 800AF 600AF 600AF 1600AF --- (3) #500MCM EA. PHASE GE�IERA� NOTES <br /> � 600AT ) o00AT ) 600AT ) 600AT ) 400AT ) 600AT ) 1200AT ) (4) �300MCM NEUTRAL <br /> � A �, A �, A �, A �, A �, A � A �, . � <br /> 1 . ALL EQUIPMENT , RACEWAYS, AND CONDUCTORS ARE <br /> - - - - <br /> - - - - <br /> EXISTING, UNLESS OTHERWISE NOTED. <br /> TO SUBSTATION #1 -3 BUS TIE TO SUBSTATION �1 -5 2. PANEL ID PREFIX: 4: 480V � �� <br /> VAULT (V03-1) 1 -3 1 -4 1 -5 VAULT (V03-3) 3: 480Y/277V � : , <br /> SEE DWG. 40-03–E4 SEE DWG. 40-03–E4b � <br /> (#00005316) �` E8 __�__ E7 E7 2: 208/120V <br /> r � (�00005318) <br /> 1000A, 4P, FULL NEUTRAL <br /> 408Y/277V BUS DUCT j j 3. (�) IN PANEL SYMBOL INDICATES BRANCH � <br /> I I CIRCUIT. �e. (7) 7abc OR 7,9,11 <br /> I I E5 E5 E5 4. TRANSFORMERS DELTA–WYE UNLESS <br /> O O O - <br /> I I OTHERWISE NOTED. <br /> j O O O j 3V03– 3V03– 3V03– 5. CONTRACTOR TO UPDATE ONE LINE WITH EXISTING <br /> 2UD10–D 2UA9-1 D 2UA9–D EQUIPMENT IN AREA OF NEW CONSTRUCTION ` <br /> � 125HP 125HP 25HP� BUS DUCT BUS DUCT � � <br /> I � 600A MCB 600A MCB 600A MCB CURRENTLY NOT SHOWN ON DRAWIf�1G. • -t' <br /> �__�.��._____� N0. 4 N0. 3 12 13 11 7 5 6 3 8 1 13 5 � <br /> MATERIAL TEST SYSTEM 2-1/2"C, (4)�4/0 � <br /> M8 RE �ERE CE DRAW GS ,� <br /> H5 <br /> M11 <br /> M1 _ _ 2"C, 3#250kcmil C <br /> � CO �ISTRUCT0 �1 �IOTES <br /> MCC �2 4V03– M8 MCC �4 <br /> 2D11 � � TO ATS XE3V03-2A9. 1�j PROVIDE 50A-2P CIRCUIT BREAKER FOR <br /> I I TEMPORARY CONSTRUCTION POWER. � <br /> 225A 225A MCB SEE DWG 40-003–E5. ; <br /> 5 " � <br /> U1 R1 U1 R7 .� <br /> � I I <br /> 3V03– 3V03– 3V03– 3V03– ► 200A 200A I T1 <br /> 2UD10A 2C9 2C10 3C9 ) 3P ) 3P <br /> 200A MCB 225A MCB 225A MCB 225A MCB � � <br /> O O �� <br /> T8 � I 100HP 100HP I � " <br /> r 45K VA T 45KVA r 75KVA T 75KVA T 75KVA " � <br /> � SPRAGUE HYD. TEST <br /> P7 P7 M9 � M9 M8 M8 BENCH PUMPS M2 . <br /> O O O O � O . <br /> 2V03– 2V03– 2V03– 2V03– 2V03– 2V03– F 2V03– <br /> 2D11 2UD10 2UD8 2UD8–A 2C9 2C9-1 2A9 <br /> 200A MCB 200A MCB 200A MCB 200A MCB 225A MCB 200A MCB 225A MCB � � <br /> �. <br /> � � � � � • . <br /> � G I N � E � $ W5741115 <br /> S U B S TAT 0 N # 1 - 4 (�� � - 2 ) - 0 N E E D A G R A Nl 1101 2nd Ave.,Suite 400�Seattle,WA 98101 PHASE 3 RENOVATION PACKAGE R r. <br /> SCALE: NTS ph 206.623.0717�fiax206.624.3775 IFC SU��IT�TAL � <br /> coffman.cnm � <br /> LASTING creativiry�resWts�relatlonships 10.0�.18 a <br /> � <br /> r <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATF J�l DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL c DATE �. • <br /> �1 • V�� ACCEPTABILITY J. OMALLEY SU�S�ATION #1-4 (V03-2) ONE-LINE DIA�RAM W5741115 I 10.08.18 � <br /> A OMIT REMOVAL OU VM AND AM HSG JSH 04.27.93 E GENERATOR SYSTEMS - GENSET �17 - RECORD 17631698 SAZAN KWA 04.13.16 ��'�,�F ��'��5��'I,� � THIS DESIGN AND/OR CHECKED � <br /> � Gj ,� SPECIFICATION IS APPROVED SHEET � <br /> B AS-BUILT (HARRIS GROUP) HGI/MCN PRH 10.15.98 F WORKPLACE ENVIRONMENT INVESTMENT W5741115 CEI PWJ 10.08.18 � � `�� � ��. � APPROVED BY DEPT. OATE ENGINEER TITLE WORKPLACE ENVIRONMENT INVESTMENT � <br /> C �. <br /> C TEAGUE OFFICE RELOCATION 11653372 WH SRM 09.26.11 CHECKED c . .. <br /> APPROVED �U!��� �� �O"��0� JOB N0. COMP N0. � <br /> � � �,w 17631698 <br /> - RECORD DRAWWG 11653372 WH SRM 03.01.12 � �� `�' n <br /> D AS-BUILT FROM VAULT CLEANING RED-LINES DM/KR KR 01.18.12 °��s��=�sTC���1� APPROVED ELECTRICAL MASTER EVERETT, WA °wc No. 40-003–E4A • <br /> �n�d��n�Q � <br />