Laserfiche WebLink
Naranjo JN 15186 <br /> • May 18,2015 Page 12 <br /> supervision or direction of the actual work of the contractor and its employees or agents. Also, job <br /> and site safety, and dimensional measurements, will be the responsibility of the contractor. <br /> During the construction phase, we will provide geotechnical observation and testing services when <br /> requested by you or your representatives. Please be aware that we can only document site work <br /> we actually observe. It is still the responsibility of your contractor or on-site construction team to <br /> verify that our recommendations are being followed, whether we are present at the site or not. <br /> The following plates are attached to complete this report: <br /> Plate 1 Vicinity Map <br /> Plate 2 Site Exploration Plan <br /> Plates 3-4 Test Pit Logs <br /> Plate 5 Typical Footing Drain Detail <br /> We appreciate the opportunity to be of service on this project. Please contact us if you have any <br /> questions, or if we can be of further assistance. <br /> Respectfully submitted, <br /> GEOTECH CONSULTANTS, INC. <br /> o'IONs7. <br /> - 0 aAsAi <br /> • <br /> James H. Strange, Jr., P.E. <br /> Associate <br /> TRC/JHS:at <br /> GEOTECH CONSULTANTS,INC. <br />