Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 12/3/2019 13:54 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 11/5/2019 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 19 3 <br /> Title CONVERT.75 INCH 2010 74TH ST SE UT3473-19-3 <br /> Work Order No 20192703 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 11/5/2019 Time 11:47 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS0885M014 WASRVC YES 11/6/2019 <br /> Address 2010 74TH ST SE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 74TH ST S.E.,201 <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 1 16.817 11/07/2019 PAP <br /> M ELLO34154947 ELBOW 3/4 NPT 45 DEG STREET BRASS(1/8 BEND) 1 4.123 11/07/2019 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 210.297 11/07/2019 PM <br /> M NIPP34131247 NIPPLE 3/4 NPT X CLOSE BRASS 1 1.4 11/07/2019 PM <br /> M SETT34146547 SETTER COPPER 5/8 X 3/4 HEIGHT 9"NO LEG LENGTH HI/HO 1 121.621 11/07/2019 PM <br /> Total Material Cost $354.26 <br />