Laserfiche WebLink
. <br /> • <br /> 6. The plans submitted for permits show an elevation change of 1 foot from one unit to the <br /> next The approved grading plans for this project include a table with finished floor levels <br /> for each lot. The table indicates an elevation change of 3.12 feet from lot 38 to lot 39 <br /> and 237 feet from lot 39 to lot 40. Elevation drawings should reflect the actual grades. <br /> It appears that the roof of the dwelling on lot 38 would be approximately 21 inches <br /> higher than the top of the roof of the dwelling on lot 39. <br /> 7. Provide building section drawings. Section drawings should reflect the actual conditions <br /> based on the finished floor levels for each structure. <br /> 8. Please provide detailing to account for resistance to uplift at all T-4 Ho(downs, <br /> particularly, where the holdown could exert upward forces to cantilevered floor <br /> elements. <br /> Please prepare a response letter showing where each item in this <br /> correction letter is addressed on the plan set. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> 6, 1 AL----- <br /> Jeff Heilman <br /> Development Technician <br /> 425-2578976 <br /> Email:jheiiman@lci.everett.wa.us <br /> dP <br /> (---) <br /> S:11Common\CIericatl7Hei{man\C1511-003(2016 78th P1 SE).doc <br />