Laserfiche WebLink
t- <br /> * <br /> INSPECTION REPORT I <br /> /A-'. Date k.b Permit: `gb q'' Otto <br /> -IP- <br /> _.. <br /> Contractor: <br /> Owner: -� 8s� <br /> Site Address: ` '7 6 q OJ .L sl,`, <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final Medi I Gas <br /> ❑Ceiling Grid ❑Drywall Nailing umbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: 2_15 C. (-1 s' C) CA© GP <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERM! <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> .0 V el0 `6 tL. I Du) - °7- <br /> r era. R tae-1M c. <br /> Inspector: Date: ib—P-.1 <br /> EIR(10/06) DATABAR,INC. <br />