My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/03/05 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/03/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:02:26 AM
Creation date
1/21/2020 10:27:58 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/5/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
954
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• U <br /> CERTIFICATE OF COMPLETION <br /> Project:Parks Roofing&Repairs—Multiple Buildings <br /> Contractor: Bates Roofing LLC <br /> Job Cost No. 101 <br /> The above-mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Parks and Recreation Department. <br /> The Contractor physically completed the project;within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> g e <br /> Parks&R eatio Director Date <br /> c210,41 <br /> Paul Kaftanski <br /> Approved by: <br /> Mayor, City of Everett Date <br /> 41111 <br /> Ray Stephanson <br /> s:\#common\projplan\project files\2013 park roofing project\acct `2i \certificate of completion.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.