My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/03/05 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/03/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:02:26 AM
Creation date
1/21/2020 10:27:58 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/5/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
954
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 0 EXHIBIT A <br /> Staff Report to Planning Commission <br /> SMA13-004/SEPA13-0201BSP13-003/REVII-028 <br /> January 21, 2014 <br /> Applicant: Robert Fitzmaurice <br /> 15 Lake Bellevue Drive #102 <br /> Bellevue, WA 98005 <br /> Planning Coordinator: John Jimerson (425) 257-8737 <br /> Requested Action: Shoreline Substantial Development Permit, Binding Site Plan <br /> and Multi-Family Modification Approval <br /> Proposal: The proposal is to construct 100 townhomes condominiums with binding site <br /> plan, including parking, recreational facilities, and restoration of a degraded stream buffer. <br /> The binding site plan would result in property lines around each townhome. The multi-family <br /> modification application is to allow a reduction in the distance between buildings. <br /> Location: 11200 Block 19th Ave SE <br /> Shoreline Designation: Urban Multi-Use <br /> Zoning: Community Business (B-2) <br /> SEPA Determination:The City of Everett issued a Final Determination of Non- Significance <br /> for the project on December 29, 2013. <br /> Exhibits: <br /> 1. Draft PC Resolution <br /> 2. Staff Report <br /> 3. JARPA Application <br /> 4. Applicant narrative for Modification of Multiple Family Standards and Guidelines <br /> 4a. Conceptual Site Plan/Building Elevations <br /> 5. Preliminary Civil Drawings <br /> 6. Recreation Plan <br /> 7. Critical Areas Study/Buffer Enhancement Plan, August 23, 2013 <br /> 8. Traffic Generation Estimate, September 6, 2013 <br /> 9. Traffic Impact Analysis, October 17, 2013 <br /> 9a. Final MDNS dated December 29, 2013 <br /> 10. SEPA Checklist <br /> 11. Storm Drainage Report- October 4, 2013 (Available at Planning Dept. for review) <br /> 12. Geotechnical Report—August 23, 2013 (Available at Planning Dept. for review) <br /> 13. 2003 Easement Agreement (Excerpt) <br /> 14. 2003 Agreement Regarding Development (Excerpt) <br /> 15. Notice of Application and Hearing <br /> 16. Agency Comments: <br /> a. City of Everett Public Works <br /> b. City of Everett Fire Department <br /> c. Everett School District <br /> d. Snohomish County Public Utilities District <br /> 150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.