Laserfiche WebLink
. <br /> Project: 112th St. SE Improvements(14th Ave SE to SR 527) <br /> 1 Change Order No. 4 <br /> Change Order Effective Date: January 21,2014 <br /> Justification for Bid Item A-63. Bid Item A-63,Pedestrian Handrail(Galvanized Steel). An additional <br /> 75.50 lineal feet of Pedestrian Handrail was needed to provide the necessary and required length above <br /> Wall no. 4 and therefore additi6nal lineal feet of handrail was added to the contract to provide a safe <br /> walking area. <br /> Exhibit C—Additional Contract Time <br /> There will be 0 working days added as a result of this change order. <br /> • <br /> • <br /> Page 6 of 6 <br /> 7 <br />