Laserfiche WebLink
February 4,2013 <br /> John Nottingham,P.E. <br /> Senior Engineer <br /> City of Everett,Public Works <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> Subject: Scope of Work—Water Pollution Control Facility Outfall 025 <br /> Dear John, <br /> The attached scope and budget describes pre-design evaluation work related to the emergency <br /> outfall at the Water Pollution Control Facility. This pre-design evaluation will provide follow up <br /> from the prior study entitled,2011 Pre-Design Evaluation prepared by URS Corporation(URS) <br /> in December 2011. This work will provide analyses not included in the prior study including <br /> geomorphologic review,bathymetric survey where gaps were discovered in available data from <br /> the Corps of Engj-neers,river hydraulic and sediment transport analysis,and a refined mixing <br /> zone analysis. This additional pre-design is needed to determine the most suitable design <br /> alternative to advance forward into design. <br /> Thank you for this opportunity to submit this proposal for this important project. Please do not <br /> hesitate to contact Carla Talich at 206.438.2125 if you have any questions or require further <br /> information. <br /> Best Regards, <br /> URS Corporation • <br /> • <br /> eka,, e-ezu <br /> Carla Talich,PE • Kevin Weed,PE <br /> Project Manager Vice President <br /> URS Corporation <br /> 1501 4th Avenue,Suite 1400 <br /> Seattle,WA 98101-1616 <br /> Tel:206.438.2700 <br /> Fax:206.438.2699 <br /> 18 <br />