2. <br /> • Task 4—Pipeline Evaluation <br /> • Task 5—NPDES Modeling <br /> • Task 6—Pre-Design Report Update(Compare Alternatives 2A&2B and Conclude with Design <br /> Approach) <br /> • Task 7—Undefined Services <br /> Work tasks are described in the following sections. An estimated project budget is presented on <br /> Attachment 1. Project duration is assumed to be six months. <br /> Task 1—Project Management <br /> The project will require a range of technical expertise from the URS team. Activities will be coordinated <br /> and directed with the goal of completing all work within budget,schedule and City objectives and <br /> expectations. Coordination and liaison with the City will be on a regular basis to ensure that these <br /> objectives are met. <br /> Progress, schedule and budget will be monitored weekly during periods of work when work is scheduled. <br /> This will be done by downloading a cost summary report from our project tracking system. Invoices will <br /> be generated every four weeks. Brief monthly progress reports will be completed as cover letters for <br /> invoices. They will summarize project progress and show total expended and remaining budget. <br /> Potential out-of-scope items will be discussed with the City's project manager and before any work is <br /> done the scope and budget for the added scope will be approved by the City in writing. <br /> URS will attend pre-design review meetings and site visits with the City. Approximately three project <br /> staff will attend these meetings,as needed depending on the main topics to be discussed. URS anticipates <br /> three meetings,as follows: <br /> • Meeting#1—Kick-off meeting. <br /> • Meeting#2—Discuss approach and initial findings. <br /> • Meeting#3—Present Draft Technical Memorandum and receive City comments. The Draft <br /> Memorandum will be submitted two weeks prior to the meeting. <br /> • Meeting#4—Pre-permit application meeting. <br /> Task 2—Survey <br /> The 2011 study included using existing survey,LiDAR,and river bathymetric data. Bathymetric data <br /> included hydrographic survey data within the navigation channel provided by the US Anny Corps of <br /> Engineers collected after dredging operations. A limited topographic survey program was completed in <br /> the prior phase by Perteet in the area of Alternative 2a. <br /> In order to conduct modeling needed for feasibility and design,bathymetric data is needed for a river <br /> reach that includes both Alternatives 2a and 2b. This data will help verify the adequacy of the Corps <br /> hydrographic survey and supplement the in channel bathymetry between the river bank and edge of the <br /> navigation channel. <br /> Work also includes providing on the ground topographic data to supplement available data and fill data <br /> gaps for the pipeline evaluation(Task 4). <br /> A scope and budget has been provided by Perteet to accomplish this work(see Attachment 2). URS will <br /> coordinate with Perteet and incorporate the survey basemap into the project alternatives analysis. <br /> • <br /> J:\Projects\E\Everett,City of\WPCF Outfall 025\00-Project Management\Scope&Budget 2013 Pre-Design Update and Design Phase\Scope of <br /> Work-Update Study Everett Outfall 025-02-03-14.doc <br /> Page 2 of 5 <br /> 20 <br />