Laserfiche WebLink
2 <br /> • Once City comments are received by URS,the document will be finalized. Three paper copies of <br /> the draft and final report will be submitted. An electronic(PDF)version of the draft and final <br /> reports will be provided. <br /> Task 7—Undefined Services <br /> This task will be used to address unanticipated tasks. URS and the City will agree in writing the scope <br /> and work for additional tasks as needed. URS will not proceed with work on this task without prior <br /> written permission from the City. <br /> A potential use for this task would be to collect additional sediment or flow velocity data as defined in <br /> Task 1.2 Field Data Sampling Plan as described in Attachment 3,provided by WEST. This scope of <br /> work assumes that these data are available through prior projects in the vicinity or dredging data from the <br /> US Army Corps of Engineers. <br /> • <br /> J:\Projects\E\Everett,City of\WPCF Outfall 025\00-Project Management\Scope&Budget\2013 Pre-Design Update and Design Phase\Scope of <br /> Work-Update Study Everett Outfall 025-02-03-14.doc <br /> Page 5 of 5 <br /> 23 <br />