Laserfiche WebLink
12/4/2019 Page 1 <br /> City of Everett <br /> 10:39:52AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. M1906-003 Site Address 3003 W CASINO RD#40-31 <br /> Applied 6/3/2019 Applicant Lot <br /> Approved 6/3/2019 Owner BOEING COMPANY Block <br /> Issued 6/3/2019 Contractor HERMANSON COMPANY LLP Tract <br /> Parent Permit No. Description REMOVE 4 A/C UNITS, INSTALL 4 AHDS&10 PINCH BOXES <br /> Notes (6/3/2019 11:36 AM TAH) <br /> CONNECTIONS&DUCTWORK,ALL ASSOCIATED PIPING-REMOVE 1 UNIT,REPLACE 4 <br /> UNITS AND MODIFY AN EXTG ONE. <br /> CUSTOMER TO SUPPLY GRIDLINES WHEN CALLING FOR INSPECTION <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 7/17/2019 7/17/2019 MECH 04-ROUGH SDP APPROVAL ok to insulate Column B13 <br /> IN 206-719-3299 <br /> 7/26/2019 7/26/2019 MECH 06-FINAL SDP PARTIAL APPR next to column b14 on second floor <br /> 206-999-9686 <br /> (7/26/2019 3:27 PM SDP) <br /> ok final for 1 or 4 units being installed <br /> (AHU-7) <br /> 40#test on supply and return lines to the <br /> unit. <br /> 9/20/2019 9/20/2019 MECH 04-ROUGH RRS PARTIAL APPR see notes 206-450-6545 <br /> IN <br /> (9/20/2019 2:42 PM RRS) <br /> inspected supply and outside air ducts from <br /> gird lines 15 to 16, and from C to D lines. <br /> ok to insulate level 2 ceiling cover. <br /> 10/22/2019 10/22/2019 MECH 06-FINAL SDP PARTIAL APPR On 3rd Floor <br /> TJ:206-450-6545 <br /> (10/22/2019 2:53 PM SDP) <br /> Ok final for RTU's A/C#14,#1,#7 <br /> Recall for A/C#2 <br /> 12/3/2019 12/3/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 12/3/2019 12/3/2019 MECH 06-FINAL SDP APPRVD-PERK eTRAKiT Inspection 12/2/2019 7:09 PM Theodore Parrott <br /> Request <br /> Contact Name:Theodore Parrott <br /> Site Address:3003 W CASINO RD#40-31 <br /> Phone:2064506545 <br /> e-Mail:Tparrott@hermanson.com <br /> INSP12 CaWsYSTEMS <br />