My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3503 30TH DR 2020-01-22
>
Address Records
>
30TH DR
>
3503
>
3503 30TH DR 2020-01-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 1:13:32 PM
Creation date
1/22/2020 1:12:47 PM
Metadata
Fields
Template:
Address Document
Street Name
30TH DR
Street Number
3503
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W•DESIGNz t .\\--,, \ <br /> ---....„,„...,_:: <br /> July 30, 2018 <br /> Polygon Northwest Company <br /> 11624 SE 5th Street, Suite 200 <br /> Bellevue,WA 98005 <br /> Attention: Michelle Dittman <br /> Building 30Summary_Letter <br /> Geotechnical Construction`Observation Services <br /> Everett Riverfront Eclipse Site <br /> Everett,Washington <br /> GeoDesign Project: Polygon-128-03 <br /> 3513 30th Drive(Permit No. C1606-090) <br /> 3511 30th Drive(Permit No.C1606-091) <br /> 3509 30th Drive(Permit No.C1606-092) <br /> 3507 30th Drive(Permit No. C1606-093) <br /> 3505 30th Drive(Permit No. C1606-094)` <br /> 3503 30th Drive(Permit No. C1606-095) <br /> 3501 30th Drive (Permit No.C1606-096) <br /> This letter provides a summary of GeoDesign, Inc.'s geotechnical construction observation <br /> services for Building 30 of the Everett Riverfront Eclipse Site in Everett,Washington. GeoDesign <br /> prepared a geotechnical report' and addendum'for this project that summarized the site <br /> conditions and provided our geotechnical recommendations. We received a set of building <br /> construction plans for the project prepared by Core Design and dated July 2015. <br /> Members of our geotechnical staff visited the site on a periodic basis between May 2015 and <br /> July 2018 to perform the following tasks: <br /> • Observe the placement of structural fill and evaluate the compaction of the fill by conducting <br /> in situ density and moisture content measurements and by observing proof rolling <br /> • Observe the placement of surcharge material and install settlement markers <br /> 'GeoDesign,Inc.,2017. Report of Geotechnical Engineering Services;Everett Riverfront Eclipse Site;Everett,Washington, <br /> dated March 16,2017. GeoDesign Project: Polygon-128-01 <br /> 2 GeoDesign,Inc.,2017. Addendum 1;Additional Explorations and Updated Geotechnical Recommendations;Everett <br /> • <br /> Riverfront Eclipse Site;Everett,Washington,dated May 31,2017. GeoDesign Project: Polygon-128-01 <br /> 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 9707 03.968.87-87 www.geodesigninc.com <br /> P <br />
The URL can be used to link to this page
Your browser does not support the video tag.