Laserfiche WebLink
4. <br /> • Monitor the surcharge settlement <br /> • Observe the installation of ground improvement trenches <br /> • Evaluate the compaction of the building subgrade by conducting in situ density and moisture <br /> content measurements and by hand probing <br /> • Evaluate the compaction of the base rock beneath the building <br /> • Verify that a vapor barrier was installed beneath the building <br /> Members of our geotechnical staff observed the,geotechnical-related tasks identified above on an <br /> intermittent and on-call basis. Their observations are summarized in field reports,which were <br /> provided to the design and construction team members and are on file in our office. <br /> To the extent observed,the construction outlined above was conducted in general conformance <br /> with the intent of the project plans, specifications, and our geotechnical engineering <br /> recommendations. <br /> ♦ ♦ ♦ <br /> We appreciate the opportunity to work with you on this project. Please call if you have questions <br /> concerning the information provided. <br /> Sincerely, <br /> - ft V. 1 . <br /> GeoDesign, Inc. �O of w.asrfriv <br /> .. .. fie. _ .. s. <br /> • <br /> Rya . Lawrence, P.E. (Oregon) 41,OPP <br /> 4 <br /> Senior Project Engineert`new <br /> 1ff <br /> `stUNALV <br /> Signed 07/30/2018 <br /> Scott V. Mills, P.E. <br /> Principal Engineer <br /> cc: Eddy Stevens, Polygon Northwest Company(via email only) <br /> Juan Espinoza, Polygon Northwest Company(via email only) <br /> RTSVM:sn <br /> One copy submitted(via email only) <br /> Document ID: Polygon-128-03-073018-geol-compliance-Bldg_30.dooc <br /> ©2018 GeoDesign,Inc. All rights reserved. <br /> GEODESIGN= 2 /h Polygon-128-03:073018 <br />