My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/03/19 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/03/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 9:24:00 AM
Creation date
1/23/2020 9:17:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/19/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Amendment No. 1 to the Water Briefing COUNCIL BILL# <br /> Pollution Control Facility Proposed Action Originating Department Public Works <br /> Expansion—Phase CI General Consent Contact Person J Nottingham <br /> Contractor/Construction Action Phone Number (425)257-8872 <br /> Manager Contract with IMCO First Reading FOR AGENDA OF 3/19/14 <br /> General Construction Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President t.y-Y.) <br /> Location Preceding Action Attachments Department(s)Approval <br /> Smith Island Approval by Council for Amendment to WPCF Public Works, Legal <br /> WPCF Expansion Phase Expansion Phase Cl <br /> Cl GC/CM Contract GC/CM Contract <br /> with IMCO Construction <br /> on 2/24/2014 <br /> Amount Budgeted $64,000,000 Fund 339 <br /> Expenditure Required $29,402,629 WO#UP-3412 <br /> $64,000,000 <br /> -$29,402,629 (Amendment) <br /> Budget Remaining $29,137,291 -$1,909,989 (Original Contract) <br /> -$3,550,091 (Engineering&City Staff) <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> This contract amendment with the City's GC/CM Contractor,IMCO General Construction from Ferndale <br /> WA,represents the inclusion of the entire Phase Cl project scope and budget,beyond the previously <br /> approved amount of$1,909,989 for the material procurement and installation of the concrete piling. City <br /> staff has successfully negotiated the Maximum Allowable Construction Costs for the entire Phase Cl project <br /> per RCW Chapter 39.10. Amendment No. 1 adds the additional project scope and$29,402,629 budget to the <br /> original pile driving contract, for a Total Contract Cost of$31,312,618. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 1 to the Water Pollution Control Facility Expansion—Phase <br /> Cl General Contractor/Construction Manager Contract with IMCO General Construction in the form <br /> substantially as provided, in the amount of$29,402,629, including Washington State Sales Tax. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.