My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4919 EVERGREEN WAY QFC 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
4919
>
QFC
>
4919 EVERGREEN WAY QFC 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 10:33:02 AM
Creation date
1/24/2020 7:47:48 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
4919
Tenant Name
QFC
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2009 VJashington Stale F�ergy Code Compliance Forms lor Nonresidential�^�+Multifamily Residential <br /> . _ . � <br /> � � • Revisetl Oecember 2010 <br /> 2009 Washington Stale Enerpy Cotlo Complian[e fortns lor Nnnresdenlial antl MulMamily Resitlential <br /> ProjectAddress 4919 Evergreen asy Date 3/14/2012 <br /> The follovnng information is necessary to check a mechanical permil application lor compliance with Ihe mechanical requiremenis in Ihe <br /> VJashinolon State Nonresidential Enemy Code. <br /> Applicabiliry Codo Location Buildinq Depatlment <br /> ( es,no,na) Section Component Inbrmalion Required on Plans Notes <br /> HVAC REQUIREMENTS Sections 1401-1424 <br /> 1q11 Equipment PeAormance <br /> Yeu 1411.1 Minimum efficiency Equipment schedule with type,capacity,efliciency <br /> M1 <br /> N.A. 1411.7 Combuslion htg. Indicate inlermittent ignilion,IluuPorah damper 8 jackel loss <br /> N.x. 1411.1 Air-cooledchiller Providelotalairandvraterchillercapaciry <br /> N.A. 14112.1 Water-cooled chiller Full-load and NPLV values adjusted lor any non-standard conditions <br /> N.x. 7411.4 Pl:g.elec.htg.8 clg. List heat pumps on schedule <br /> n.A. 1411.5 Unenclosed Heal Indicate radiant heal system and occupancy controls <br /> 1412 HVAC CONrcls <br /> N.A. 1472.7 TemperaWie zones Indicate locations on pla�.�s <br /> M1 <br /> xee 1412.2 Deadband contrcl Indicate 5 degree deadband minimum <br /> tt.A. 1412.3 Humidiry conlrol Indicate humidislat <br /> xee 1412.4 Setback and Shulolt Indicate Ihermoslat wi�h 7 day pmgram capa6ilily 8 required setback <br /> M1 <br /> N.A. 1412.4.1 Dampers Indicate damper localion,leakage rale,control type,&mas.leakage <br /> N.A. 1412.42 Optimum Start Indlwte optimum start coNwls <br /> N.A. 1412.5 Heal pump conlrol Indicate heat pump thermoslant d outdoor lockout on schetluie <br /> ta.A. 1412.6 Combustion heating Indicate modulating or staged control <br /> M1 <br /> Yeu 14127 Balancing Indica�o balancing feaWres on pnns <br /> N.A. 1412.8 VeMilalion Conlrol Indicate demand control ventilation lor high�occupancy areas <br /> N A 141z 9 Loading Dock 8 Indicate enclosed loadin�dock&parking garage ventilalion system <br /> Gara e Ventilation ar.tivation and conlrol melhod. <br /> N.t.. 7422 Thermostalintedock Indicatelhermostatintedock on plans <br /> N.n. 1432.2.1 TemperaWra Reset Indicate temperature reset melhod <br /> 1413 Alr/Watcr Economizers <br /> N.x. 1472.1 Single zone systems Indicate mulliple cooling stage coNrol capability. <br /> M1 <br /> Yee 1413J Air Econo Operation Indicale 100°b capability on schedule <br /> N.A. 1413.1 W1r Econo Operation Indicate 70096 capacity a145 degF db 8 40 deg F wb <br /> N.A. 1413.2 Wtr Econo Documen Indicale max.OSA condilion lor design clg load&equipmenl <br /> pedormance data. <br /> w.A. 1413.3 Integratedoperalion Indicalecapability�orpartialcooling <br /> N.A. 1413.4 Humidificalion Indicate dired evap or fog alomization w/air economizer <br /> 1q14 Ducting Systems <br /> tt.x. 1474.7 Duct sealing Indicate duct design pressures,sealing,and testing requirements <br /> N.A. 7414.72 Low press.duc�tesl Indicale applicable low pressure duct systems shall be leak tested <br /> Indicate high pressure duct systems shall be leak tested,and identify <br /> N.t.. 1474.1.3 High press.duc�test �he loca;ion of this ductwork on plans <br /> N.A. 14742 Duct insulalion Indicate 9�value ol insulation on ducl <br /> 1415 Piping Systems <br /> i <br /> N.A. 1475.1 Piping insulalion Indicate R�value ol insulation on piping <br /> 1416 omplet on Requiremenis <br /> xee 1416.32 System Balancing Indicate air and waler system balancing requirements <br /> M1 <br /> xce 1416.3.3 Functional Testing Pmvide sequence oi operations and test procedurzs. <br /> H1 <br /> Yee 1416.3.4 Documentation Indicaie 08M manuals,record drawings,staff Iraining <br /> M1 <br /> xee 1416.3.5 Comm.Report Indicate requiremenls lor linal commissioning report <br /> M1 <br /> N.A. 1416,4 Compliance Chklist Submit�o building oflicial upon substanlial completian. <br /> Ye� Mechanlcal Summary Form Compleled and a�tached. Equipment schetlule wilh rypes,inpuVoutpul. <br /> eflicienc .cim.hp,economizer <br /> \�;Il� <br />
The URL can be used to link to this page
Your browser does not support the video tag.