My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2802 HOYT AVE EVERETT ELKS 2018-01-02 MF Import
>
Address Records
>
HOYT AVE
>
2802
>
EVERETT ELKS
>
2802 HOYT AVE EVERETT ELKS 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 12:16:55 PM
Creation date
1/27/2020 10:52:59 AM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
2802
Tenant Name
EVERETT ELKS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kirk Brooks <br />From: Tom Thetford <br />Sent: Thursday, February 12, 2009 11:18 AM <br />To: Kirk Brooks <br />Subject: FW: Water line contribution for California Street project between Rucker and Hoyt Ave <br />From: <br />Tom Thetford <br />Sent: <br />Thursday, December 18, 2008 7:49 AM <br />To: <br />Kirk Brooks <br />Subject: <br />FW: Water line mntn7ution for California Street project bete ,en Rucker and Hoyt Ave. <br />Kirk, <br />Has Jack been given any information about the requirements for the domestic and fire service for this development? <br />From: Tom Thetford <br />Sent: Wednesday, December 17, 2008 10:33 AM <br />To; 'jack@cobra-construcbon.com' <br />Cc: Kirk Brooks; Mike Ward; Pat McClain <br />Subject: Water line contribution fr,r California Street project between Rucker and H�, We. <br />Jack, <br />Based on our meeting on December 111h and our phone conversation today, the Utility will commit to paying for all of the <br />pipeline materials and will provide the labor to connect and install this pipeline from the 8" main in Rucker Ave. to the 8" <br />main in Hoyt Ave. along the south side of California Street. Cobra construction will excavate the trench for this pipeline <br />between the two connection points identified above and, once the line is installed by City crews, backfill and restore the <br />surface to comply with City Development Standards. Cobra will provide the City with the taping saddles and valves for the <br />two service connections and the City will Install them and the connection piping to the basement mechanical room for this <br />project. This shared apt.;oach to developing this site will help to improve water quali,, end flow characteristics for this <br />downtown area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.