My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 10:12:14 AM
Creation date
1/28/2020 9:54:46 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E EVERETT <br /> Project title: Local Agency A&E Professional Services Consultant Agreement with TranTech Engineering, Inc. <br /> for the design of the Edgewater Creek Bridge Replacement Project. <br /> City Council Agenda Item Cover Sheet <br /> Council Bill it Consideration: Local Agency A&E Professional Services Agreement <br /> Project: Edgewater Creek Bridge Replacement <br /> Agenda dates requested: Partner/Supplier: TranTech Engineering, Inc. <br /> January 15,2020 Location: Mukilteo Boulevard at Edgewater Creek <br /> Briefing Preceding action: City Ordinance No.3719-19,approved 12/18/19 <br /> Proposed action Fund: 303 <br /> Consent <br /> Action <br /> Ordinance Fiscal summary statement: <br /> Public hearing <br /> Yes X No This Professional Services Consultant Agreement will cover the preliminary design,final <br /> design and potential for construction support services for the project.The cost of <br /> Budget amendment: $1,803,078 will be funded at 80%by a Federal grant and 20%through local matching <br /> Yes x No funds as approved by City of Everett Ordinance No. 3719-19. <br /> PowerPoint presentation: <br /> Yes X No <br /> Attachments: <br /> Proposed Agreement(2) Project summary statement: <br /> Department(s)involved: This project will remove and replace the existing Edgewater Creek Bridge, which was <br /> Public Works,Admin built in 1946 and is a vital link in a chain of three bridges that provide the only access to <br /> Contact person: neighborhoods along Mukilteo Boulevard. <br /> Gael Fisk TranTech Engineering, Inc.was selected through a qualification-based selection process <br /> Phone number: - that included advertisement of a Request for Qualifications (RFQ),a detailed review of <br /> (425)257-8909 submitted qualifications and an interview process.Two consultant firms submitted <br /> qualifications in response to the RFQ.The qualification statements and the interview <br /> Email: <br /> results were evaluated and scored by the project team.TranTech Engineering, Inc.was <br /> gfisk@everettwa.gov <br /> selected as the most qualified firm. <br /> Recommendation (exact action requested of Council): • <br /> Initialed by: Authorize the Mayor to sign the Local Agency A&E Professional Services Consultant <br /> Agreement with TranTech Engineering, Inc.for the design of the Edgewater Creek Bridge <br /> t head Replacement Project in the amount of$1,803,078. <br /> A. (ration <br /> Council President <br /> 9 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.