Laserfiche WebLink
I <br /> I • Everett Fire Department Strategic Plan—2013 l <br /> Figure 18: Facilities and Apparatus <br /> II <br /> Pump testing is completed on a regular basis. 61.0 .#, 14.4 <br /> I <br /> Ladder testing is completed on a regular basis. 63.6 I 21.2 13.6 <br /> IHose testing is completed on a regular basis. 66.1 20.3 1111 <br /> I Apparatus repairs and maintenace are completed in <br /> 26.3 <br /> a timely manner. 51.7 wi <br /> 1 2 ,,, <br /> Ill <br /> Apparatus are well maintained. 30.5 49.2 <br /> ll <br /> The current fleet of apparatus is adequate to meet , • <br /> the needs of the department. 14.5 41.9 23.1 5. <br /> I <br /> 1. <br /> The facilities are in good repair. 13.8 53.4 16.%"— <br /> I <br /> IThe facilities are well maintained. 14.7 56.9 x2 <br /> I The existing facilities are adequate to meet the . <br /> needs of the department. 1 31.1 : <br /> I0% 25% 50% 75% 100% <br /> •Strongly Agree Somewhat Agree tk Somewhat Disagree •Strongly Disagree •No Opinion <br /> IThe majority of the respondents viewed small equipment, apparatus and facility condition to be good to <br /> I very good. The most frequent comments appear to be opinions about where Station 3 should be <br /> located. <br /> I <br /> I <br /> /,.. o ... Page 23 <br />